Loading...
1151_0001.tif • I E I s 2009 INTERNA CITY F BL AIR RR FIND CHECKOFF SHEET lair C ity Hall Dior to Final Inspection Return to � ��► Y � 21 l Street,. BIa!r, NE 68008 Because of limitations ca y used b the infeasibility to 'perform detailed inspections which would tease iindicate com liance with the following requirements not interfere with reroofing work`, p p Following this reroofing job. Permit #us 7 i I f I �• ' . Installation Date: YES O 3-30 The materials and methods of application used for recovering or repiacing the existing roof covering comply with the requirements of the building code. (R907.1) CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of underla Y meet or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eaye's edge to a paint at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) sTR UGTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads • -... that will be encountered during installation of the roof covering system. (R907.2 � EXIs ING caVERIC�G VAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 [� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) P LASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which 907.6 bitu ' o s materials are to be adhered shall be primed prior to installation. ( ) T- -� D Signature of ri staller ate i Signature of Holder Date i