2009 INT ERN ATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEEN`
n to Blair City all•prior to Final Inspection f
Return � to �
218 W 6 Street, Blain NE 680 08
Because of limitations caused by the infeasibility to , perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
o Permit #: , . I
z
installation Date: La --(k -d I
YES NO
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE C PROTECTION CNSTAlLED: An ice barrier that consists of at least two layers of
�
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wail line of the building, (8905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof c y
erin s ystem and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
[� EXISTING COVERIC G wAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
F�p,SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
ignature of Primary Installer
Date
Date
Signature of Permit Holder