Loading...
7456_0001 (2).tif i 2 009 INTERNATI S CITY CAF BLAIR REROOFIN CH EC KO FSHEET F R eturn to Blair City Hall' prior to Final Inspection , � th S 218 S 18 street. Blair, N � 8Sa0 Because of limitations caused b y the infeasibility to *perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements ; following. this reroofing job. Permit #: , " � -o 1 Installation Date: _ ti YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1 ) f � ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers 'of underla y meet or of a self-adhering polymer modified bitumen sheet was installed and extends at least the eaye's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARB SOUND. The structural roof components are [� capable ©f supporting the roof covering system and the material and equipment loads • ...6 that will be encountered during installation of the roof covering system. (8907.2 H • EXISTrNO COVERING WAS REMa11 ',' Existing roof'covering was removed for one 7,M C1 of the reasons required by section R907.3 NO RUSTEb METAL OR PLASHING: Existing vent hashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FLA SHING INSTALLED PROPERLY; Plashing shall be reconstructed in accordance I�. with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer Date 4 s oll ' a l tura of Pe it Holder Date