523_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR REROOFING CHEC KOFF SKEET
Return to Blair City Half prior to Final inspection
218S16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: WS- UA
Installation Date:
YES NO
YES
The materials and methods of application used for recovering or replacing the existing
roof covering c ompl y with the requirements of the building code. (R907.1
ICE PROTECTION INSTA LLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering pol modified bitumen sheet was installed and
extends at least from the eave's edg to a point at least 24 inside nside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: . The structural roof components are
tern and the material and equipment loads
capable of supporting the roof covering sys
that will be encountered during installation of the r oof covering system. (R907.2)
EXI WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO OR FLASHI Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTA PROPERLY: Flashing shall be reconstructed in accordance
l
with approved manufacturer's installation instructions Meta flashing to which
bitumino materials are to be adhered shall be primed prior to installation. (R907.6)
Date
Signature of Pri ry nstaller
Date
Signature of Permit Holder