Loading...
523_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE - CITY OF BLAIR REROOFING CHEC KOFF SKEET Return to Blair City Half prior to Final inspection 218S16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: WS- UA Installation Date: YES NO YES The materials and methods of application used for recovering or replacing the existing roof covering c ompl y with the requirements of the building code. (R907.1 ICE PROTECTION INSTA LLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering pol modified bitumen sheet was installed and extends at least from the eave's edg to a point at least 24 inside nside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: . The structural roof components are tern and the material and equipment loads capable of supporting the roof covering sys that will be encountered during installation of the r oof covering system. (R907.2) EXI WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO OR FLASHI Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTA PROPERLY: Flashing shall be reconstructed in accordance l with approved manufacturer's installation instructions Meta flashing to which bitumino materials are to be adhered shall be primed prior to installation. (R907.6) Date Signature of Pri ry nstaller Date Signature of Permit Holder