1211_0001.tif i
2009 INTERNATIONAL RESIDENTIAL CODE -
[ REROOF C HECKO FF SHEET
C ITY l..A�
to Blair city Hall'priorto Final inspection
Return 16 � �
218 S '16 Street, Blair, NE 88 008
• s which vvc�u[d
Because of limitations caused by the infeasibility to *perform detailed inspections n ch would
not interfere with reroofing work, please indicate compliance with the g req ui re m en t s
followinn this reroofing job.
.f
hermit #�
7// Install ation Date.
�n The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
C� ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla meet or of aself- adhering polymer modified bitumen sheet was installed and
Y
extends at least from the eaye's edge to a point at least 24 inches inside the exterior
wall line of the buildings (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof Y
of covering system and the material and equipment loads
.
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING caV
ERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
Na RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
PLASHIN
G INSTALLED PROPERLY; Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sl nature of Prim ry Instal Date
r
Date
What e of Permit Holde