Loading...
2204_0001.tif -4 TIL CODE - 2009 INTERNATIONAL RES CITY O LAI R REROOFING CHECKOFF SHEET Return to Bla City Hall'prior to Final i M S 16t" street, Blair, NE 68008 Because of limitations caused by the infeasibility to 'perform detailed i which would not interfere with reroofing work, please indicate compliance with the following req uirements follow!M this reroofing job. Permit #:—L3— Lo 5 6 S 20 (4 Installation Date IV No replacing the existing The materials and methods o f a pplication used for r ecovering or roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of polymer modified bitumen see in and underlayment or of a self-adhering poly ht wa J aLstalled � eave's edge to a point at least 24 inches inside the exterior extends at least from the wall line of the building. R905.2.7-1) STRUCTURAL COMPONENTS ARE SOUND: The structural r oof components are capable o f supporting the r oof covering system and the material and equipment loads that will be encountered during installatioll of the . roof covering system. (R907.2) EXISTING COVERING WAS REWIgVED: Existing r oof covering was removed for one of the reasons required by section R907.3 NO RU STED METAL OR FLASHING: Existing ng vent flashing, metal edges, drain ou tlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5) PLASHING INSTALLED P,ROPERLY_g. Flashing shall be reconstructed in accordance with approved m anufacturer's i i Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) � Si of Prim ry Installer Date –I—Ly Date - Sigature of 0'ermit Holder