2204_0001.tif -4
TIL CODE -
2009 INTERNATIONAL RES
CITY O LAI
R REROOFING CHECKOFF SHEET
Return to Bla City Hall'prior to Final i
M S 16t" street, Blair, NE 68008
Because of limitations caused by the infeasibility to 'perform detailed i which would
not interfere with reroofing work, please indicate compliance with the following req uirements
follow!M this reroofing job.
Permit #:—L3— Lo
5 6 S
20 (4
Installation Date
IV No replacing the existing
The materials and methods o f a pplication used for r ecovering or
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
polymer modified bitumen see in and
underlayment or of a self-adhering poly ht wa J aLstalled �
eave's edge to a point at least 24 inches inside the exterior
extends at least from the
wall line of the building. R905.2.7-1)
STRUCTURAL COMPONENTS
ARE SOUND: The structural r oof components are
capable o f supporting the r oof covering system and the material and equipment loads
that will be encountered during installatioll of the . roof covering system. (R907.2)
EXISTING COVERING WAS REWIgVED: Existing r oof covering was removed for one
of the reasons required by section R907.3
NO RU STED METAL OR FLASHING: Existing ng vent flashing, metal edges, drain
ou tlets, collars or metal counter flashing were not reinstalled if rusted. (8907.5)
PLASHING INSTALLED P,ROPERLY_g. Flashing shall be reconstructed in accordance
with approved m anufacturer's i i Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
�
Si of Prim ry Installer Date
–I—Ly
Date
- Sigature of 0'ermit Holder