153_0001.tif i
2009 I N T E RN A TIONAL RESID
CITY OF BLAIR RERO OFING CHECKOFF SHEET
Blair C ity Hallprwlor to Final Inspection G
Return to t� 8
218 s 'l8 street. B lair, NE 8880 E
Because of limitations caused b the infeasibility to 'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
i
Permit #: , u
Installation Date:
YES NO
/ 7L pp
The materials and
methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (8907.1)
� ICE pROTBOTION INSTALLED: An ice barrier that consists of at least two layers 'of
underla meet or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eaye's ed a to a point the exterior
wall line of the building. (R905.23J)
C�
STRUCTURAL COMpONENTs ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
• that will be encountered during installation of the roof covering system. (8907.2
ExISTI NO COVERING WAS REMOVED: Existing roof'covering was removed for one
� .
of the reasons required by section 8907.3
[� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
��` Metalashing to which
with approved manufacturer's installation Instructions. l flashing la installation. R907.G}
bituminous materials are to be adhered shall be primed prior
Sig nature of Primary Installer Date
Si a
Date
ure of hermit Hold r
r