Loading...
153_0001.tif i 2009 I N T E RN A TIONAL RESID CITY OF BLAIR RERO OFING CHECKOFF SHEET Blair C ity Hallprwlor to Final Inspection G Return to t� 8 218 s 'l8 street. B lair, NE 8880 E Because of limitations caused b the infeasibility to 'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. i Permit #: , u Installation Date: YES NO / 7L pp The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (8907.1) � ICE pROTBOTION INSTALLED: An ice barrier that consists of at least two layers 'of underla meet or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eaye's ed a to a point the exterior wall line of the building. (R905.23J) C� STRUCTURAL COMpONENTs ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads • that will be encountered during installation of the roof covering system. (8907.2 ExISTI NO COVERING WAS REMOVED: Existing roof'covering was removed for one � . of the reasons required by section 8907.3 [� NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance ��` Metalashing to which with approved manufacturer's installation Instructions. l flashing la installation. R907.G} bituminous materials are to be adhered shall be primed prior Sig nature of Primary Installer Date Si a Date ure of hermit Hold r r