1118_0001.tif S
2 009 INTER RESQ
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall' prior to Fi Inspectio E
218S16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to *perform detailed inspections which d G
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
Permit #: '
Installation Date:
7
YES 0
� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
al t pm STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
ent loads
overin s stem and the material and equi
capable of supporting the roof c overing y
that will be encountered during installation of the roof covering system. (R907.2}
[� EXIST
ING COVERIC�G WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHINGx Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
iturninous materials are to be adhered shall be primed prior to installation. (8907.6)
Signature f Primary Installer Date
Signature of Per it Holder Date
i