Loading...
1118_0001.tif S 2 009 INTER RESQ CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall' prior to Fi Inspectio E 218S16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to *perform detailed inspections which d G not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: ' Installation Date: 7 YES 0 � The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) al t pm STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are ent loads overin s stem and the material and equi capable of supporting the roof c overing y that will be encountered during installation of the roof covering system. (R907.2} [� EXIST ING COVERIC�G WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHINGx Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which iturninous materials are to be adhered shall be primed prior to installation. (8907.6) Signature f Primary Installer Date Signature of Per it Holder Date i