Loading...
910_0001.tif IL 11 AL OWN 2009 INTERNA 1103" NA L RESADENTIAL uuut CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 2#18 S 16th street, Blalr NE 68008 Because of limitations caused by the Infeasibility to perform detailed I which would not interfere w reroofing work, please indicate c ompliance with the following requirements following this reroofing job. --7 L/ 3 Permit Installation DaW. YES NO The materials and methods o f a pplication used for recovering or replacing the existing roof covering comply with the requirements of the building code, (8907.1) ICE PROTECTION INSTALLED. An Ice barrier that consists of at least two layers of odified bitumen sheet was installed and underlayment or of a self-adhering polymer m extends a t least from the eave's,,edge to a point at least 24 inches lnslde the exterior wall line of the bulldlng� (R905.2.7-1) STRUCTU rr)mPoNENTS ARE SOUND: The structural roo co mponents are capable of supporting the ro of covering system and the material and equipment loads that will be encountered during installation of the r oof covering system, (R907.2) EXIS TIMMrtoVFRING WAS REMOVED: Existing roof covering was r emoved for one of the reasons required by section R907.3 NO RUSTED METAL O R FLASHING: Existing vent flashing, metal edges, drain ou tl e t s , collars or metal counter-flashing were not reinstalled if rusted. (R907.5) FLA INSTALLED PROPER Flashing shall be reconstructed In accordance installation instructions. Metal flashing to which biturnin with ap ate proved are to be adhered shall be primed prior to installation. (8907.6) vA wrials -7 U P Date r!6ary Installer Dat d ig atur6 o Pe mit Holder