CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
2#18 S 16th street, Blalr NE 68008
Because of limitations caused by the Infeasibility to perform detailed I which would
not interfere w reroofing work, please indicate c ompliance with the following requirements
following this reroofing job. --7
L/
3
Permit
Installation DaW.
YES NO
The materials and methods o f a pplication used for recovering or replacing the existing
roof covering comply with the requirements of the building code, (8907.1)
ICE PROTECTION INSTALLED. An Ice barrier that consists of at least two layers of
odified bitumen sheet was installed and
underlayment or of a self-adhering polymer m
extends a t least from the eave's,,edge to a point at least 24 inches lnslde the exterior
wall line of the bulldlng� (R905.2.7-1)
STRUCTU rr)mPoNENTS ARE SOUND: The structural roo co mponents are
capable of supporting the ro of covering system and the material and equipment loads
that will be encountered during installation of the r oof covering system, (R907.2)
EXIS TIMMrtoVFRING WAS REMOVED: Existing roof covering was r emoved for one
of the reasons required by section R907.3
NO RUSTED METAL O R FLASHING: Existing vent flashing, metal edges, drain
ou tl e t s , collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLA INSTALLED PROPER Flashing shall be reconstructed In accordance
installation instructions. Metal flashing to which
biturnin
with ap ate proved are to be adhered shall be primed prior to installation. (8907.6)
vA wrials
-7 U
P
Date
r!6ary Installer
Dat
d ig atur6 o Pe mit Holder