Loading...
1308_0001.tif 2009 INTERNATIONAL RESIDENTIAL CODE. CITY OF BLAIR REROOFING CHECKOFF SHEET o Final I Return to Blair City Hall prior t 2`18 S, 16 th Street, Blair, NE 68008 B ecaus e of limitations caused by the infeasibility t detailed i which would not interfere with reroofing work, please indicate compliance with th following req uirements following this reroofing job. co Permit • Installation Date: 75" ­7­) YES/ NO The materials and methods o f a pplication used for r ecovering or replacing the existing roof covering com w ith the requirements of the building code. (R907.1) ICE PROTE C T INSTALLED: An ice, barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and po int at least 24 inches inside the exterior extends at least from the ea ve'�d �e to a wall line of the building. (R905.2.7.1) STR IRAL COMPONENTS ARE SOU_ND The structural roo com ponents are capable o f supporting the roof covering system and the material and equipment loads that will be encountered during installation of the . roof covering system. (R907.2) E XI-QTIMr-, coVERING WAS REMOVED: Existing r oof covering was r emoved for one of the reasons required by section 8907.3 NO P1 IRTED METAL OR F.LASHINGm. Existing vent flashing, m etal edges, drain ou tlets, collars or metal counter-flashing were reinstalled if rusted. (R907.5) i:i'aqH'WG INSTALLED PROPERL_Y Flashing shall be recon structed i accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be, primed prior to installation. (R907.6) Date Signature of Primary Installer 7 ....... Date tig of Permit Holder