CITY OF BLAIR REROOFING CHECKOFF SHEET
o Final I
Return to Blair City Hall prior t
2`18 S, 16 th Street, Blair, NE 68008
B ecaus e of limitations caused by the infeasibility t detailed i which would
not interfere with reroofing work, please indicate compliance with th following req uirements
following this reroofing job. co
Permit
•
Installation Date: 75"
7)
YES/ NO
The materials and methods o f a pplication used for r ecovering or replacing the existing
roof covering com w ith the requirements of the building code. (R907.1)
ICE PROTE C T INSTALLED: An ice, barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
po int at least 24 inches inside the exterior
extends at least from the ea ve'�d �e to a
wall line of the building. (R905.2.7.1)
STR IRAL COMPONENTS ARE SOU_ND The structural roo com ponents are
capable o f supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the . roof covering system. (R907.2)
E XI-QTIMr-, coVERING WAS REMOVED: Existing r oof covering was r emoved for one
of the reasons required by section 8907.3
NO P1 IRTED METAL OR F.LASHINGm. Existing vent flashing, m etal edges, drain
ou tlets, collars or metal counter-flashing were reinstalled if rusted. (R907.5)
i:i'aqH'WG INSTALLED PROPERL_Y Flashing shall be recon structed i accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be, primed prior to installation. (R907.6)
Date
Signature of Primary Installer
7
....... Date
tig of Permit Holder