.2009 INTERNATIONAL RESIDENTIAL CODE CI OF BLAIR REROOF
Return to Blair City Hall'priorto Final inspection
218S16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which woul
not interfere with reroofing work, please indicate compliance with the following requirem ents
following this reroofing job.
Permit #: _
Installation Date:
YES
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla Y meet or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail lime of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
g Y
capable of supporting the roof
coveri system and the material and equipment loads
.
., that will be encountered during installation of the . roof covering system. (R907.2)
EXISTING COVE
RING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
N
O RUSTED METAL OR I~LASHINCx Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were reinstalled if rusted. (R907.5)
PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bitumen
ou aterials are to be adhered shall be primed prior to installation. (R907.6)
, °
/� _
Signature o imary Installer Date
Signa ure of Permit Holder