Loading...
957_0001.tif i ° t .2009 INTERNATIONAL RESIDENTIAL CODE CI OF BLAIR REROOF Return to Blair City Hall'priorto Final inspection 218S16 th Street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which woul not interfere with reroofing work, please indicate compliance with the following requirem ents following this reroofing job. Permit #: _ Installation Date: YES The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underla Y meet or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail lime of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are g Y capable of supporting the roof coveri system and the material and equipment loads . ., that will be encountered during installation of the . roof covering system. (R907.2) EXISTING COVE RING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 N O RUSTED METAL OR I~LASHINCx Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were reinstalled if rusted. (R907.5) PLASHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bitumen ou aterials are to be adhered shall be primed prior to installation. (R907.6) , ° /� _ Signature o imary Installer Date Signa ure of Permit Holder