243_0001.tif I I
2 009 IN T E RNATIONAL� RESIDENTIAL CODE -
CITY OF BLAIR REROOF ING CHECKOFF SHEET .
Return to Blair City Hall* prior to Final Inspection
218 S 16 Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
a 4
>A
Permit #:
f
Installation Date:
YES No
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
. c
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.23.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
4 capable of supporting the roof covering system and the material and equipment loads
I that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.8)
f
Agra ure of ri ary Installer
Date
Date
Signature of Permit Holder
3 4(
I
t
I '
4