Loading...
243_0001.tif I I 2 009 IN T E RNATIONAL� RESIDENTIAL CODE - CITY OF BLAIR REROOF ING CHECKOFF SHEET . Return to Blair City Hall* prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. a 4 >A Permit #: f Installation Date: YES No The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) . c ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.23.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are 4 capable of supporting the roof covering system and the material and equipment loads I that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) ❑ FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.8) f Agra ure of ri ary Installer Date Date Signature of Permit Holder 3 4( I t I ' 4