Loading...
2180_0001 (2).tif 2009 INTERNATIONAL R'ESIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEEN` Return to Bla"Ir City Hall'pr*lor to Final inspection 218 S'16th street,. Blair, NE 6800*8 Because of limitations caused by the infeasibility to •perform detailed inspections which would not interfere with reroofing work please indicate c ompliance with the following requirements following. this reroofing job. Permit #: � � � ��� � � � � � Installation Date: YES NO 7 M The materials and methods of a pplication used for recovering or replacing the existing roof covering com ply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underla y meet or of a self-adhering polymer mod bitumen sheet was installed and extends at least from the eave!s edge to a point the exterior wall line of the building. (R905.2.7.1) STRI 1(-.Tl MAL COMPONENTS ARE SOUND. The structural roof components are capable 6f supporting the roof covering system and the material and equipm e nt loads • that will be encountered during installation of th r oof covering system. (R907.2) EXIS VAS REMOVED: Existing rootcovering was r emoved for one of the reasons required by section 8907.3 No RUSTED METAL O R FLASHING: Existing vent flashing, m etal edges, drain ou tl e t s , collars or metal counter-flashing were not reinstall ed if rusted. (8907.6) LASHING LED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation Instructions. Metal flashing to onic h b ituminous materials are to be adhered shall be primed prior to installat. (R907.6) Da a eig4na u of Primary Installer Signature of Permit Holder Daft