2180_0001 (2).tif 2009 INTERNATIONAL R'ESIDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF SHEEN`
Return to Bla"Ir City Hall'pr*lor to Final inspection
218 S'16th street,. Blair, NE 6800*8
Because of limitations caused by the infeasibility to •perform detailed inspections which would
not interfere with reroofing work please indicate c ompliance with the following requirements
following. this reroofing job.
Permit #: � � � ��� � � � � �
Installation Date:
YES NO 7
M The materials and methods of a pplication used for recovering or replacing the existing
roof covering com ply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla y meet or of a self-adhering polymer mod bitumen sheet was installed and
extends at least from the eave!s edge to a point the exterior
wall line of the building. (R905.2.7.1)
STRI 1(-.Tl MAL COMPONENTS ARE SOUND. The structural roof components are
capable 6f supporting the roof covering system and the material and equipm e nt loads
• that will be encountered during installation of th r oof covering system. (R907.2)
EXIS
VAS REMOVED: Existing rootcovering was r emoved for one
of the reasons required by section 8907.3
No RUSTED METAL O R FLASHING: Existing vent flashing, m etal edges, drain ou tl e t s , collars or metal counter-flashing were not reinstall ed if rusted. (8907.6)
LASHING LED PROPERLY Flashing shall be reconstructed in accordance
with approved manufacturer's installation Instructions. Metal flashing to onic h b ituminous materials are to be adhered shall be primed prior to installat. (R907.6)
Da a
eig4na u of Primary Installer
Signature of Permit Holder Daft