Loading...
1633_0001.tif i 2009 INTERNATIONAL RESIDENTIAL CODE - C I T Y OF LAIR REROOFING CHECKOFF SHEEN' Retu to Blair City Cif Hall'pr to Final inspection sinspection , V 8 s i 6 Street,. Blair, NB 68005 Because of l� 'tations caused by the infeasibility to 'perform detailed inspections which would ` mt not interfere with reroofing work, please indicate compliance with the following requirements fol, lowin this reroofing job. e M. � � ` D/ Per . Installation Date: " ou • —' YES NO The materials and methods of application used for recovering or replacing the existing � roof covering comply with the requirements of the building code. (R907.1) � 1 CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers bf underla y ment or of a self-adhering polymer modified bitumen sheet was in stalled a extends at (east from the eave's edge to a point at least 24 inches inside the extern r wall line of the building. (R905.2.7.1) STR. UGTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2 L� EXIST IMG COVERING WAS REMOVED. Existing roof covering was removed for one of the reasons required by section R907.3 [� Na RUSTED METAL OR FLASHING*. Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (8907.5) FL ASHiNG INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing toc 8907.6 bituminous materials are to be adhered shall be primed prior to installation. ( ) f /. Signature of Primary Installer Dat . g Sign ature of Permit Holder D to i i