2009 INTERNATIONAL RESIDENTIAL CODE -
C I T Y OF LAIR REROOFING CHECKOFF SHEEN'
Retu to Blair City Cif Hall'pr to Final inspection sinspection ,
V 8 s i 6 Street,. Blair, NB 68005
Because of l� 'tations caused by the infeasibility to 'perform detailed inspections which would
` mt
not interfere with reroofing work, please indicate compliance with the following requirements
fol, lowin this reroofing job.
e M. � � ` D/
Per .
Installation Date:
" ou
• —'
YES NO
The materials and methods of application used for recovering or replacing the existing
�
roof covering comply with the requirements of the building code. (R907.1)
� 1
CE PROTECTION INSTALLED: An ice barrier that consists of at least two layers bf
underla y ment or of a self-adhering polymer modified bitumen sheet was in stalled a
extends at (east from the eave's edge to a point at least 24 inches inside the extern r
wall line of the building. (R905.2.7.1)
STR.
UGTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2
L� EXIST
IMG COVERING WAS REMOVED. Existing roof covering was removed for one
of the reasons required by section R907.3
[� Na RUSTED METAL OR FLASHING*. Existing vent flashing, metal edges, drain
outlets, collars or metal
counter- flashing were not reinstalled if rusted. (8907.5)
FL
ASHiNG INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing toc 8907.6
bituminous materials are to be adhered shall be primed prior to installation. ( )
f /.
Signature of Primary Installer Dat
. g
Sign ature of Permit Holder D to