Loading...
2038_0001.tif i i 2009 INTERN RESIDENTI CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 2'18 S '16 Street, Blair, NE 680 Because of limitations caused by the infeasibility to perform detailed 'inspection which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. a ON Permit #: Z O L 1 Installation Date: VI=Q NO I [� The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) j Q ICE PROTECTION INSTALLED: An ice barrier that consisfis of at least two layers of underlayment or of aself- adhering polymer mer modified bitumen sheet was installed and extends at least from the cave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) ® STRUCTURAL COMPONENTS ARE SOUND: and The the m material and equipment loads capable of supporting the roof covering system that will be encountered during installation of the roof covering system. (R907.2) EXISTING C OVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 ® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance i with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) ignature of Primary Install Date Date gnature of Permit Holder