2038_0001.tif i
i
2009 INTERN RESIDENTI
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
2'18 S '16 Street, Blair, NE 680
Because of limitations caused by the infeasibility to perform detailed 'inspection which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
a
ON
Permit #: Z O L
1
Installation Date:
VI=Q NO I
[� The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
j
Q ICE PROTECTION INSTALLED: An ice barrier that consisfis of at least two layers of
underlayment or of aself- adhering polymer mer modified bitumen sheet was installed and
extends at least from the cave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
® STRUCTURAL COMPONENTS ARE SOUND: and The the m material and equipment loads
capable of supporting the roof covering system
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING C
OVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
® NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
i
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
ignature of Primary Install
Date
Date
gnature of Permit Holder