Loading...
3079_0001.tif i i i Jul 09 14 04:27p Dave Cerise 402 -427 -7414 p.2 N' 1AL 2009 INTERNATIONAL RESIDENT CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Bair City Hall prior to Final Inspection 218 S 16 Street, Blair NB 68008 Because of limitations caused by the infeasibllity to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. i ao Permit M _ _ - i Installation Date: , �( YES O The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907A) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of ment or of aself- adhering polymer modified bitumen sheet was installed and underla y Dint at least 24 inches inside the exterior extends at least from the eaye's edge to a p wall line of the building. (R905• STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering syste m yste material and equipment loads that will be encountered during installation of her of covering l E3CIS AS REMO ED: Existing roof covering was removed for one of the reasons required by section R907.6 i l NO RUSTED BffETAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) ❑ PLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturers installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) i t Date ig ure of Primary Installer Date Sig at e of Kermit Holder j