Loading...
266_0001-1.tif i I Jul 09 14 04:27p Dave Cerise 402 -427 -7414 p.l INTERNA RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEE Return to Blair city Hall prior to Final lnspedion 218 S 16P Street, Blair, NE 58008 Because of timitations caused by the infeasibility to -perform with In pecti lowing $ which it ments not interfere with reroofing work, please indicate complian following this reroofing job. Permit 9: sue - installation Date: YES NO The materials and methods of application used for recov rep � the e roof cover coin p Y 1 with the requirements of the building ` . ® ICE pROTECT[QN INSTALLED: An ice barrier that consists o sheet eet was tw o nstalled and underlaymerit or of aself- adhering polymer modified bitumen extends at feast from the eave's ed a to a point at least 24 inches inside the exterior wall line of the building. (R905,23. 1) STRUCTURAL C ©MPONENTS ARE SOUND: The structural roof components are equipment loads capable of supporting the roof covering system an the material land that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS RENIC�VEi�a Existing roof covering was removed for one of the reasons required by section 8907.3 "NCO EtUSTED METAL OR oun e FLA SH ING. aslZing were Existin n t reinstalled I outlets, co or metal o i rrusfeedges, drain [� FLASHING INSTALLED PROPERLY Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) 6primaryIns Iler Date Date 4 n V a , tie of Z Permlt Holder i