Loading...
12645_0001.tif i Ju1.09.2014 04:16 PM PAPILLION WINDOWS & SIDIN 4025971777 PAGE. 2/ 2 INTERNATI CITE' OF BLAIR REROOFING CHECKOFF SHEET Return to Blair city Mail p to Final inspection 21 8 S 16 s treet, Blair, NE 68008 because of l9mitstlon8 caused by the infeasibility to perform detailed Inspection$ which would not interfere with reroofing work, please indicate compliance with the following requirernent$ oilnlNl this reroofing job. � 00 b Permit #• � 4 1 ` Installation Date: � � k� G/ YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8807.1) Q LCF_ fJE TION INsTAL.L t7 : An ice barrier that consists of at lest two layers and underlayment or of a self adhering polymer modified bitumen sheet wash stall d extends least fro the save'§ ed a to a point at lust 2� in es ' side the exterior wall line of the building. (R905•2.7.1) STRt_CTURA1. CCIMPONENTS AaE t]UNI7: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered daring installation of the roof covering system. (119072) Ct]Vf RINIa AS REMOV Existing roof covering was removed for one � EX1STt . of the reAons required by section R907.3 NO I LISTED lIf1ETAI OR P LASHING. Existing vent flashing, metal edges, drain outlets, collars or metal counter flashing were not reinstalled if rusted. (R907.5) C3 FLASHING NSTALLED P QPi =RLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered shall be primed prior to Installation. (R907•6) _ q� Signature of aer aller ate Sig t' re o ate I