Loading...
20140716103752828_0008.tif 20 I NTERNATION AL RESIDENTI CODE - C ITY OF BLAIR RE ROOFING CHECKOFF SHEET Return to Blair City Mall prior to Final inspection 218 S 1 6 t " Street, Blair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. Permit #: - DO, � 0 Installation Date: YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) Q ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed an extends at least from the eave's edge to a point at leash 24 itches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are coverin s uipment loads capable of supporting the roof g stem and the material and eq y that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I • I NO RUSTED METAL OR FLASHING= Existing vent flashing, metal edges, drain outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5) PEI ri FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) L4Z a_ ure of P i ry In alley Date i f r 3 Sig re of e it Holder Date � i