Loading...
20140716103752828_0007.tif 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall'prior to Final inspection 218 S 16t" street, Blair, NE 68008 Because of limitations caused by the infeasibility to'perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. 3 Permit #: 4 Installation Date: us YES NO The m aterials and methods o f a pplication used for recovering or replacing the existing roof covering c omply with the requirements of the building code. (8907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underlayment or of a self-adhering polymer modified bitumen sheet was installed and extends at least from the egyg'j ed e to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) S T RUCTURAL COMPONENTS ARE SOUND: . The structural roof components are TR capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) COVERI WAS REMOVED: Existing r oof covering was removed for one of the reasons required by section R907.3 NO RUSTED MET OR FLASHIN Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5) rl FLASHING INSTAL PROPER shall be reconstructed in accordance with approved m anufacturer's installation instructi ons. Metal flashing to which bitumino s materials are to be adhered shall be primed prior to installation. (R907.6) Date Signature of Prima In ler "Signature of Permit Holder Date