20140716103752828_0007.tif 2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall'prior to Final inspection
218 S 16t" street, Blair, NE 68008
Because of limitations caused by the infeasibility to'perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
3
Permit #:
4
Installation Date: us
YES NO
The m aterials and methods o f a pplication used for recovering or replacing the existing
roof covering c omply with the requirements of the building code. (8907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from the egyg'j ed e to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
S T RUCTURAL COMPONENTS ARE SOUND: . The structural roof components are
TR
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
COVERI WAS REMOVED: Existing r oof covering was removed for one
of the reasons required by section R907.3
NO RUSTED MET OR FLASHIN Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
rl FLASHING INSTAL PROPER shall be reconstructed in accordance
with approved m anufacturer's installation instructi ons. Metal flashing to which
bitumino s materials are to be adhered shall be primed prior to installation. (R907.6)
Date
Signature of Prima In ler
"Signature of Permit Holder Date