20140716103752828_0006.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF BLAIR. R
EROOFING CHECKOFF SHEET
Return to Bla`Ir City Hall' prior to Final inspection
218S16 th Street, Blair, NE 68008
B of limitations caused by the infeasibility to *perform detailed i which would
not interfere with reroofing work, please indicate compliance with the following requirements
following, this reroofing job.
Permit #:
Installation Date:
YES 7-0
NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was installed and
extends at least from to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
ST RUCTURAL COMP ONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
NG
IN WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
ou tlets, collars or metal counter-flashing were not reinstal led if rusted. (8907.5)
FLASHING INSTA PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bilium!
biturn! u materials are to be adhered shall be primed prior to installation. (R907.6)
L �m a
2L�
Date
Signature of Prima In Iler
Date
Signature o Permit Holder