20140716103752828_0002.tif 2009 INTERNATIONAL RESIDENTIAL CODE -
CITY OF B
LAIR. REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final Inspection
218 S 16 street, Blair, NE 68008
Because of limitations caused by the infeasibility to *perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following- this reroofing job.
Permit #:
Installation Date:
YES NO
The materials and methods of a pplication used for recovering or replacing the existing
roof covering c omply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underlayment or of a self-adhering polymer modified bitumen sheet was in and
extends at least from the eave's edg to a point at least 24 inches insid the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOU . The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REWIgVED Existing roof covering was removed for one
of the reasons required by section R907.3
No RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
s
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature 6T Yrimary Installer Date
Date
Sign` tune f ermit Holder