20140715161819617_0009.tif 07-15-'14 10:50 FROM-Absolute Customs T-026 P0001/0001 F-057
2009 INTERNATIONAL RESIDENTIAL CODE
6 " I L /Y
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Slair City Hall prior to Final Inspection
218 S 1W Blair, NE 68008
B ecause o f li caused by the Infeasibility to'lierform deialled i which would
V i with reroofing work, please Indicate comp w ith the following requirements
following this reroofing job.
Permit#: lieblq-
_MW
Installation Datw
YES NO
The materials all tkda of popflicattion used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907-1)
ICE PROTECTION INSTALLED: An fee barrier that consists of at least two layers Of
underlayment or of a self-adhering polymer Modified bitLimen sheet was installed and
extends at least from the ea—ye's efte to a point at least 24 !no the exterior
wall line of building. (R9O5.2.7.1)
'� smUCTURAI. COMPONIENTS ARE _qeii imn Tho istructural roof component,4 are
capable of supporting the roof covering system and the material and equipment loads
ti that will be encountered during installation of the roof covering system, (R907.2)
EXISTING CgVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NQ RUSTaD METAL OR F.,LASHIN F-Asting vent flashing, metal edges, drain
outlets, collars or metal counter-flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PRO PEWY_: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation, (11907.6)
lal).
19lgnatuFe'6f'Primary nstaller
'71 W-1
ign►turo of ar 1 Holder