Loading...
20140715161819617_0008.tif 07-15-'14 10:50 FROM-Absolute Customs T-026 10001/0001 F-056 2009 WIDENTIAL CODE - CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall pew to Final Inspection 218 8 16th Stroot, Blair, NE 68008 Because of lil-nitations caused by the Infeasibility to'perforlij detailed Inspections which would Mot interfere with reroofing work, please indleato compliance with the following requirements f :W lp g this roroofing job. A- Permit Installation Date; YES No The materials and methods of appliontiOn used for recovering or replacing the existing roof covering c omply with the requirements of the building code. (RaVA) ICE PROTECTION INSTALLF An ice barrier that consists of at least two WOrs Of underlayment, or of a self-adhering polymer modified bitumen sheet was inata.1led and extends a t l from the eaves .14 99-9 to a point at least 24,inche e the exterior wall line of the building. (11905.23J) $TRUrTURAL COMPONENTS .l RE The structural roof conlPnentsam capable of supporting the roof covering system and the material and e loads that will be encountered during installation of the roof covering s (R907.2) P-XI STI14G rOVERjN 0 . WAS REMOVE Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED M.RTAL OR.FLASIJING-, Existing ventflashing, metal edges, drain outlets, collars or metal counter-flashing were n ot reinstalled If rusted. (ROO7.5) ❑ FLASHING INSTALLEQ,PROPERLY: Flashing shall be reconstructed in acoordance with approved manufacturer's Installation instructions. Metal flashing to which hall be pr imed prior to installation, (11007.6) bituminous materials are to be adhered s ri I P 6 n . . a a 'Date' a f Pri 1risfalfer t fliQc, 1 � 91inckture Of Vormit Holder