20140715161819617_0008.tif 07-15-'14 10:50 FROM-Absolute Customs T-026 10001/0001 F-056
2009 WIDENTIAL CODE -
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall pew to Final Inspection
218 8 16th Stroot, Blair, NE 68008
Because of lil-nitations caused by the Infeasibility to'perforlij detailed Inspections which would
Mot interfere with reroofing work, please indleato compliance with the following requirements
f
:W lp g this roroofing job.
A-
Permit
Installation Date;
YES No
The materials and methods of appliontiOn used for recovering or replacing the existing
roof covering c omply with the requirements of the building code. (RaVA)
ICE PROTECTION INSTALLF An ice barrier that consists of at least two WOrs Of
underlayment, or of a self-adhering polymer modified bitumen sheet was inata.1led and
extends a t l from the eaves .14 99-9 to a point at least 24,inche e the exterior
wall line of the building. (11905.23J)
$TRUrTURAL COMPONENTS .l RE The structural roof conlPnentsam
capable of supporting the roof covering system and the material and e loads
that will be encountered during installation of the roof covering s (R907.2)
P-XI STI14G rOVERjN 0 . WAS REMOVE Existing roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED M.RTAL OR.FLASIJING-, Existing ventflashing, metal edges, drain
outlets,
collars or metal counter-flashing were n ot reinstalled If rusted. (ROO7.5)
❑ FLASHING INSTALLEQ,PROPERLY: Flashing shall be reconstructed in acoordance
with approved manufacturer's Installation instructions. Metal flashing to which
hall be pr imed prior to installation, (11007.6)
bituminous materials are to be adhered s ri I
P
6 n . . a a 'Date'
a f Pri 1risfalfer
t fliQc,
1 �
91inckture Of Vormit Holder