Loading...
20140715161819617_0007.tif E f 1 07- 15 -'14 10,49 FRCS]- Absolute Customs T -026 P0001/0001 F -055 W% VO4 2009 IONTERN ATIONAL RESIDENTIAL COur. - C ITY OF BLAIR REROOFING CHECKOFF S H EET Return to Blair City H a ll prior t Eifel inspection 18 S 16th Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to'perform detailed Inspeotions which would interfere with reroofing work please indicate compliance with the following requirements oliowlnc this reroofii1q job. Permit 4. .�" � 00 (102- Installation Date: Y ' , The materials and methods of applica tion used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICS PROTF- - ripi'1 INSTALLED: An ice harrier that consists of at least two layers of underlayment or of a self - adhering polymer Modified bitumen sheet was installed and extends least from the eave's edg to a prink ido the exterior wall line of the building. (11006.�L7.1) S TRUCT URA L COMPONENTS ARE SOUND: Tha structural roof components are capable of suppotfing the roof covering system and the material and equipment leads that will be encountered during installation of the roof covering system. (11007.2) EXISTING COVERING WAS IREMOV 1W.- Existing roof covering wa,s removed for one of the xeasons required by sections 8907.3 fits ► RU 'tE 1V1B'i+A O1. 1= ASHING: rlxi8ting vont flashing, metal edges, drain cutlets, collars or metal oounter flashing were not reinstalled if rusted. (R907.5) ` Q FLA HI I 1 ►TAL .I=a PRQR RLY: Flashing shall be reconstructed in acoordanoe With approved manufacturer's installation instructions, Metal flashing to which bituminous materials are to be adhered small be primed prior to installation, (8907.6) K 0AAAqd lgnature of Prlmary Installer *at t 9Vgr'ature of _rrnit H ate r