20140715161819617_0007.tif E
f
1
07- 15 -'14 10,49 FRCS]- Absolute Customs T -026 P0001/0001 F -055
W% VO4
2009 IONTERN ATIONAL RESIDENTIAL COur. -
C ITY OF BLAIR REROOFING CHECKOFF S H EET
Return to Blair City H a ll prior t Eifel inspection
18 S 16th Street, Blair, NE 68008
Because of limitations caused by the Infeasibility to'perform detailed Inspeotions which would
interfere with reroofing work please indicate compliance with the following requirements
oliowlnc this reroofii1q job.
Permit 4. .�" � 00 (102-
Installation Date:
Y ' ,
The materials and methods of applica tion used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICS PROTF- - ripi'1 INSTALLED: An ice harrier that consists of at least two layers of
underlayment or of a self - adhering polymer Modified bitumen sheet was installed and
extends least from the eave's edg to a prink ido the exterior
wall line of the building. (11006.�L7.1)
S TRUCT URA L COMPONENTS ARE SOUND: Tha structural roof components are
capable of suppotfing the roof covering system and the material and equipment leads
that will be encountered during installation of the roof covering system. (11007.2)
EXISTING COVERING WAS IREMOV 1W.- Existing roof covering wa,s removed for one
of the xeasons required by sections 8907.3
fits ► RU 'tE 1V1B'i+A O1. 1= ASHING: rlxi8ting vont flashing, metal edges, drain
cutlets, collars or metal oounter flashing were not reinstalled if rusted. (R907.5)
` Q FLA HI I 1 ►TAL .I=a PRQR RLY: Flashing shall be reconstructed in acoordanoe
With approved manufacturer's installation instructions, Metal flashing to which
bituminous materials are to be adhered small be primed prior to installation, (8907.6)
K
0AAAqd
lgnature of Prlmary Installer *at
t
9Vgr'ature of _rrnit H ate
r