Loading...
20140715161819617_0006.tif i 07-15-'14 10:49 FROM- Absolute Customs T -025 P0001/0001 F -054 I 2009 W""TERNATIONAL RESIDENTIAL CODE I t I CITY O F BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prior to Final inspection = " . 18 S W St reet, Blair, NE 68008 , Booauso of limitations caused by the infeasibility to perform detailed inspection$ which would Vot interfere With rer oofing work, please in dicate oomplianoo with the following requironients following this reroofing Job. I`ei•mit - tlftx? Installation Date: > y YES NO oa, The material; and methods of application i ised for recovering or rGplaoing the existing l roof oovoriiig comp y r ( with the of the building code (8907.1) g ICE PROTECTION INSTALL Q: An ice barrier that consists of at least two layers of underlays ent of of a self - adhering polymer modified bitumen sheet was in st Y alled and aerda from. this eave':c to ~ point at least i the inside Ilia exterior wall line of the building. (R905.2.7A) S TRUCTURAL COMPONENTS LE S OUND - : The structural roof components are oapable of supporting the roof o efing system and the material and equipment loads .. that will be encountered during installation of the rOOf covering system. (R907 EXISTING COVERING WA Rl ltfl�V�l�; ��€istinc� roof coverii�� was removed for one of the reasons required by seotion 8907,3 NO RUSTED RETAL OR FLASHING; Existing vent flashing, metal edges, drain 01-WC AS' collars or metal counter - flashing Were not reinstalled if misted. (R90 FLASHING ii�S`f At LEQ FR0PF,.RLY. Flashing shall be reconstructed in accordance with approved menufactuver's installation instructiaris. Metal flashing to which Wtuminous materials are to he adhered shall be primed prior to installation. (1190.6) S i g n ature � of Primary lnstall�r D Ito nature o l ?ermit Holder Dat — i I