20140715161819617_0006.tif i
07-15-'14 10:49 FROM- Absolute Customs T -025 P0001/0001 F -054 I
2009 W""TERNATIONAL RESIDENTIAL CODE
I
t
I
CITY O F BLAIR REROOFING CHECKOFF SHEET
Return to Blair City Hall prior to Final inspection = " .
18 S W St reet, Blair, NE 68008
,
Booauso of limitations caused by the infeasibility to perform detailed inspection$ which would
Vot interfere With rer oofing work, please in dicate oomplianoo with the following requironients
following this reroofing Job.
I`ei•mit - tlftx?
Installation Date: > y
YES NO oa,
The material; and methods of application i ised for recovering or rGplaoing the existing
l
roof oovoriiig comp y r ( with the of the building code (8907.1)
g
ICE PROTECTION INSTALL Q: An ice barrier that consists of at least two layers of
underlays ent of of a self - adhering polymer modified bitumen sheet was in st Y alled and
aerda from. this eave':c to ~ point at least i the inside Ilia exterior
wall line of the building. (R905.2.7A)
S TRUCTURAL COMPONENTS LE S OUND - : The structural roof components are
oapable of supporting the roof o efing system and the material and equipment loads
.. that will be encountered during installation of the rOOf covering system. (R907
EXISTING COVERING WA Rl ltfl�V�l�; ��€istinc� roof coverii�� was removed for one
of the reasons required by seotion 8907,3
NO RUSTED RETAL OR FLASHING; Existing vent flashing, metal edges, drain
01-WC AS' collars or metal counter - flashing Were not reinstalled if misted. (R90
FLASHING ii�S`f At LEQ FR0PF,.RLY. Flashing shall be reconstructed in accordance with approved menufactuver's installation instructiaris. Metal flashing to which
Wtuminous materials are to he adhered shall be primed prior to installation. (1190.6)
S i g n ature � of Primary lnstall�r D Ito
nature o l ?ermit Holder Dat —
i
I