Loading...
20140715161819617_0005.tif 07-15-'14 10 :49 FROM- Absolute Customs T -025 P0001/0001 F -053 E 2 009 ATI A TIAL CODE E CITY OF BLAIR REROOFING CHECKOFF SHEET Roturn to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 6$008 Oooause of limitations caused by the li feasibility to perform dotalled hispectiens which would neat interfere with rej'oofinq worm, please indleate compliance with the following regUirsment$ f ollowing , this reroef og job, Permit #: Installation Dates YFA No J The materials and methods of application used for recovering or replacing the ex ist ing roof covering comply with the requiremento of the building code. (R90 7_1) ICE PROTECTION 1NSTAt - : An loo barrier that consist$ of at least two layers Of underlayment or of a eelf adhering polymer modified bitunjen sheet was installed and extends at leapt fro) the eave's ed a to a point at least 24 inc e� �t� e lie exterior wall line of the building. (R905.2.7.1) ISTRUCTURAI, 9OMPONENT ARE SO-UND.* The structural roof components are material and equipment toads capable of support 1ng the roof covering system and the that will be enoountored during installation of the roof oovering system. (R007.2) EXISTING GOVERI40 WAS REMOVED: Existing roof covering was removed for One of the reasons required by section R907 NIQ RUs - rr=D Mam . QTZ FLASHING! ExIiAing vent flashing, metal edges, drain outlets, cellars or metal ccuntor- flashing were not reinstalled if rusted. (R907,5) LA I-lll (N S'#"�1LL Q PROR R IG Flashing shall be reconstructed in accordance with approved manufaotur er`s installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to instalW10n ( R907•6) q /I E ignattife. of Primary in staller � Dtit t ignature �ori°rtit �oltler � Oafe I. I