20140715161819617_0004.tif i
07-02-'14 10:08 FROM- T -007 P0001/0091 F -013
2009 INTERNATIONAL I
RESIDEN CODE - c
C ITY OF BLAIR REROOFING HECKOF ' SHEEN`
R eturn to Blair City Mail prior t Final Inspectio" -
1 ► �' troot, Blair, NE 63008
a
Because of limitations caused by the Infeasibility to perform detailed Inspections whloh would
not interfere with reroofing work please In+dicato compliance with the follolnring requirements I
foil win this reroofing job. I
Permit Ty\1
Installation Date'.
YES NO
The materials and methods of application used for recovering or replacing the existing
' ements of the building code. (R907,1) reef covering comply with the requ irements
1CFE PROTECTION IN TALLER►: An Ice barrier that consists of at least two layers Of
underlayment or of a self s adhering polymer modified bitumen sheet w installed and
extents at least fro the a ve's ed a to a point at least 24 ono s inside the exterior
wall line of the building. (11905.2.7.1) -
S TRUCTURAL able of supporting the g system CC�t1 PONl�NT - ARE SOUND: The structural roof components are
oa�a
e roof coverin s stem and the material and equipment loads
k that will be encountered during installation of the roof covering system. (8907.2)
EXISTING CaVERING WAS REMOVED: Existing root covering was removed for one
�y of the reasons required by section 8.907.3
1 Ho RWSTED iV MTAL OR ELA HING Existing vent flashing, metal edges, drain
outlets, collars or meta c g ounter= tlashin were not reinstalled if rusted, (11907,6)
Fl ,A Hl1V lir1 `l'A .LE[ PROPER t.Y: Flashing shall be reconstructed its accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (ROO '.6)
*i(ginature of Primary lnstallo � VD
j
U b
*Onttur, G to
_ I
i