Loading...
20140715161819617_0004.tif i 07-02-'14 10:08 FROM- T -007 P0001/0091 F -013 2009 INTERNATIONAL I RESIDEN CODE - c C ITY OF BLAIR REROOFING HECKOF ' SHEEN` R eturn to Blair City Mail prior t Final Inspectio" - 1 ► �' troot, Blair, NE 63008 a Because of limitations caused by the Infeasibility to perform detailed Inspections whloh would not interfere with reroofing work please In+dicato compliance with the follolnring requirements I foil win this reroofing job. I Permit Ty\1 Installation Date'. YES NO The materials and methods of application used for recovering or replacing the existing ' ements of the building code. (R907,1) reef covering comply with the requ irements 1CFE PROTECTION IN TALLER►: An Ice barrier that consists of at least two layers Of underlayment or of a self s adhering polymer modified bitumen sheet w installed and extents at least fro the a ve's ed a to a point at least 24 ono s inside the exterior wall line of the building. (11905.2.7.1) - S TRUCTURAL able of supporting the g system CC�t1 PONl�NT - ARE SOUND: The structural roof components are oa�a e roof coverin s stem and the material and equipment loads k that will be encountered during installation of the roof covering system. (8907.2) EXISTING CaVERING WAS REMOVED: Existing root covering was removed for one �y of the reasons required by section 8.907.3 1 Ho RWSTED iV MTAL OR ELA HING Existing vent flashing, metal edges, drain outlets, collars or meta c g ounter= tlashin were not reinstalled if rusted, (11907,6) Fl ,A Hl1V lir1 `l'A .LE[ PROPER t.Y: Flashing shall be reconstructed its accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (ROO '.6) *i(ginature of Primary lnstallo � VD j U b *Onttur, G to _ I i