Loading...
20140715161819617_0003.tif j 6 s i 2009 INTERNATIONAL CITY O BLAI RE ROOFING SHEET Cit Hall prior to Final Inspection Return to Blair y p 2'18 S'16 th Street, Blair, NE 88008 f Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following, this reroofing job, 7 Permit #: c 7 Y J J Installation Date: l 0 ,5 'l YE NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of underla Y ment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2,7.1) STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are capable of supporting the r 9 Y roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING ' WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituinou s materials are to be adhered shall be primed prior to installation. (R907.6) y, i c Signature of Primary I taller Date Si nature of Permit Holder Date i