2009 INTERNATIONAL
CITY O BLAI
RE
ROOFING SHEET
Cit Hall prior to Final Inspection
Return to Blair y p
2'18 S'16 th Street, Blair, NE 88008
f
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following, this reroofing job,
7
Permit #:
c 7 Y J J
Installation Date:
l
0 ,5 'l
YE NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED: An ice barrier that consists of at least two layers of
underla Y ment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2,7.1)
STRUCTURAL. COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the r 9 Y roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING
COVERING ' WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituinou
s materials are to be adhered shall be primed prior to installation. (R907.6)
y,
i
c
Signature of Primary I taller Date
Si nature of Permit Holder Date