Loading...
456 (2).tif Weatherguard, Inc. 402 -289 -4345 p.3 `E 2009 INTERNATIONAL RESIDENTIAL COU FING CHECKOFF i I I I f CITE'' AI SHE R eturn to siair C Hall prior to Final inspection 218 I 6th street, Blair, NE 68008 cau sed h the infeasibility to perl"orm detailed inspections which would Because of limitations y not interfere with reroofing work, please indicate corrtpliance with the fallowing requirements following this reroofing job. ----------- Perm Installation Date; r �` YES NO I The materials and methods of application used for recovering or replacing the existing i roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED: An ice harrier that consists of at least two layers of � self-adhering p modified bitumen sheet was installed and ur�derlayment or of a s g p extends afi least from the cave'$d e e to a point at least 24 inches inside the exterior wall line of the building. (890 STRUCTURAL COMPONENTS ARE SOUND. The structural roof components are the roof covering system and the material and equipment Loads capable of supporting , 8907.2) that will be encountered during installation of the roof covering sy stem { E XISTING CaVERING WAS REMOVED; Existing roof covering was removed for one of the reasons required by section 8907. ra ND RUSTED METAL. OR FLA.SHINGA. Existing vent flashing, metal edge En outlets, collars or metal counter flashing were not reinstalled if rusted, (R907,6) i FLASHING IN L Flashing shall be reconstructed in accordance with a roved manufacturer's installation instructions. Metal fl a s ln� on. 8 pp 907.6) biturnin.�zu Materials are to be adhered shall be primed prior to tnstallatt .... Date Si atur �. Primary t er Id Date Sign a ure of Permit bolder I