Loading...
ms-2014-00272 check-off_0001.tif i i cri 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF ECLAIR, REROOFING CHECKOFF SHEET Return to Blair City Hall prier to Final Inspection 218 S I e Street, Blair, NE 68008 Because of limitations caused by the Infeasibility to perform detailed Inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followin this reroofing job. Permit installation Date: YPS NO Nr ❑ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ❑ ICE PROTECTION INSTALLED : An ice barrier that consists of at least two layers of underiayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a paint at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) ❑ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8997.3 ❑ NO RUSTED METAL OR PLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter-flashing were not reinstalled if rusted. (R9O7.5) E r ❑ FLASHING INSTALLED RROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8907.6) Slgn ure of Primary Installer ate Signature of Permit Holder date i