Loading...
MS-2014-00271-1.tif i Jun 12 2014 9:59AM HP 4027345550 page 1 lq q' Z RESIDENTIAL Z009 INTERNATIONAL CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Mall prior to Final Inspection 218 18 Street Blair, NE 88808 Because of limitations caused by the Infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements followlng this reroofing job. Permit bill Installation Date: YES Na The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at bast 24 inches inside the exterior wall line of the building. (8905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R9O7.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (8907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (11907.6) Qn of Primary installer Date Sign furs of emit Holder ate