Steven J And Donna Tucker May 9, 2014
832 N 14th St
BLAIR NE 68008 -0000
Permit Number: ME- 2013 -00226
Replacing A/C and furnace with new 3 ton A/C and 80,000 BTU furnace
Estimated Completion Date: 7/9/2013
Dear permit holder,
This letter is to inform you that the above referenced permit has gone beyond the
Estimated Completion Date shown above.
If the permit is ready for a final inspection, please contact the Building Department
at 402.426.4191 to schedule a final inspection. Please keep in mind that the project
should not be used until after the final inspection has passed.
If the permit is not ready for a final inspection, please contact Howard Wolfe, Blair
Building Inspector, at 402.426.4191 as soon as possible to provide him with a status
update of the project.
Thank you in advance foryour cooperation in this matter.