Loading...
ME-2013-00226.tif i I I i mdse of � tAIQ ..... .......... i Steven J And Donna Tucker May 9, 2014 832 N 14th St BLAIR NE 68008 -0000 Permit Number: ME- 2013 -00226 Replacing A/C and furnace with new 3 ton A/C and 80,000 BTU furnace Estimated Completion Date: 7/9/2013 Dear permit holder, This letter is to inform you that the above referenced permit has gone beyond the Estimated Completion Date shown above. If the permit is ready for a final inspection, please contact the Building Department at 402.426.4191 to schedule a final inspection. Please keep in mind that the project should not be used until after the final inspection has passed. If the permit is not ready for a final inspection, please contact Howard Wolfe, Blair Building Inspector, at 402.426.4191 as soon as possible to provide him with a status update of the project. Thank you in advance foryour cooperation in this matter. Sincerely, 7( C��� Phil Green Assistant City Administrator i Cc: Building Inspector ea >oA,� 218 South 16th Street - Blair, Nebraska 68008 ^ 402 -426 -4191 • Fax 402 - 426 -4195 • E -mail dtyofblair @d blair ne,us