Loading...
PL-2013-00457_0002.tif CI TQ pro mise of I Newland, Marlow D And Jo Nae April 24, 2014 1117 N 25th Ave j BLAIR NE 68008 -0000 Permit Number: PL- 2013 -00457 Water Heater Replacement Estimated Completion Date: 10/20/2013 Dear permit holder, This letter is to inform you that the above referenced permit has gone beyond the Estimated Completion Date shown above. If the permit is ready for a final inspection, please contact the Building Department at 402.426.4191 to schedule a final inspection. Please keep in mind that the project should not be used until after the final inspection has passed. If the permit is not ready for a final inspection, please contact Howard Wolfe, Blair Building Inspector, at 402.426.4191 as soon as possible to provide him with a status update of the project. Thank you in advance foryour cooperation in this matter. Sincerely, Phil Green Assistant City Administrator Cc: Building Inspector i 218 South 16th Street • Blair, Nebraska 68008 ° 402- 426 -4191 ° Fax 402- 426 -4195 E -mail dtyofblair @ci.blair,ne,us 0