PL-2013-00457_0002.tif CI
TQ
pro mise of
I
Newland, Marlow D And Jo Nae April 24, 2014
1117 N 25th Ave j
BLAIR NE 68008 -0000
Permit Number: PL- 2013 -00457
Water Heater Replacement
Estimated Completion Date: 10/20/2013
Dear permit holder,
This letter is to inform you that the above referenced permit has gone beyond the
Estimated Completion Date shown above.
If the permit is ready for a final inspection, please contact the Building Department
at 402.426.4191 to schedule a final inspection. Please keep in mind that the project
should not be used until after the final inspection has passed.
If the permit is not ready for a final inspection, please contact Howard Wolfe, Blair
Building Inspector, at 402.426.4191 as soon as possible to provide him with a status
update of the project.
Thank you in advance foryour cooperation in this matter.
Sincerely,
Phil Green
Assistant City Administrator
Cc: Building Inspector
i
218 South 16th Street • Blair, Nebraska 68008 ° 402- 426 -4191 ° Fax 402- 426 -4195 E -mail dtyofblair @ci.blair,ne,us 0