2009 INTERNATIONAL RESIDENTIAL CODE
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to Blair MY Hall prior to Final inspection
21 8 S '1 G th Street, Blair, NE 68008
because of ilmitatlons caused bythe Infeasibillt�rto perform detailed Inspections which would
not interfere with reroofing work please indleate compliance with the following requirements
foilowinu. this reroofing Job.
i
permits
i
installation Cate;
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (11907.1)
IGE P OTECrtioN 1NSTALLF -D: An ice barrier that consists of at least two layers of
underlayrnent or of a self - adhering polymer modified bitumen sheet was lnsAW ed and
extends at least from the eav&s ed a to a point at least 24 inches i side the exterior
wall line of the building. (8805.2.7.1)
S`FRId JUR & COMPONENT'S ARE SQUNi. -. The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encourrteme i during installatlon of the roof covering system, (8807.2)
lE)EISTING COVERING WA 3 REMOVI =D: Existing roof covering was removed for one
of the reasons required by section 8907.3 I
NO RUSTED METAL OR PLASHING. Existing vent flashing, metai edges, drain
outlets, collars or metal counter ilashing were not reinstalled if rusted. (R907.5)
EL SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance
with approved manufacturer`s installation Instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (8807.0)
aturQ of Primary Installer Date
A2, z2m�--�
$i ature of permit Holder Date