Loading...
MS-2013-00516_0001.tif Feb. 5. 2014 2:22 ?M CITY OF B CAIR 14 Q- 426 41911 hl o. 2416 F. i 2009 INTERNATIONAL RESIDENTIAL CODE CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair MY Hall prior to Final inspection 21 8 S '1 G th Street, Blair, NE 68008 because of ilmitatlons caused bythe Infeasibillt�rto perform detailed Inspections which would not interfere with reroofing work please indleate compliance with the following requirements foilowinu. this reroofing Job. i permits i installation Cate; YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (11907.1) IGE P OTECrtioN 1NSTALLF -D: An ice barrier that consists of at least two layers of underlayrnent or of a self - adhering polymer modified bitumen sheet was lnsAW ed and extends at least from the eav&s ed a to a point at least 24 inches i side the exterior wall line of the building. (8805.2.7.1) S`FRId JUR & COMPONENT'S ARE SQUNi. -. The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encourrteme i during installatlon of the roof covering system, (8807.2) lE)EISTING COVERING WA 3 REMOVI =D: Existing roof covering was removed for one of the reasons required by section 8907.3 I NO RUSTED METAL OR PLASHING. Existing vent flashing, metai edges, drain outlets, collars or metal counter ilashing were not reinstalled if rusted. (R907.5) EL SHING INSTALLED PROPERLY: Plashing shall be reconstructed in accordance with approved manufacturer`s installation Instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (8807.0) aturQ of Primary Installer Date A2, z2m�--� $i ature of permit Holder Date 6'd