Loading...
MS-2012-00454_0001 (2).tif I TQ CITy f U D M Nicole Watzke January 17, 2014 1965 Washington St BLAIR NE 68008 -0000 Permit Number: MS- 2012 -00454 Replacing Roof with Asphalt shingles Estimated Completion Date: 11/12/2012 Dear permit holder, This letter is to inform you that the above referenced permit has gone beyond the Estimated Completion Date shown above. If the permit is ready for a final inspection, please contact the Building Department at 402.426.4191 to schedule a final inspection. Please keep in mind that the project should not be used until afterthe final inspection has passed. If the permit is not ready for a final inspection, please contact Howard Wolfe, Blair Building Inspector, at 402.426.4191 as soon as possible to provide him with a status update of the project. Thankyou in advance foryour cooperation in this matter. Sincerely, Phil Green Assistant City Administrator Cc: Building Inspector 218 South 16th Street Blair, Nebraska 68008 a 402 -426 -4191 Fax 402- 426 -4195 E -mail cltyofblair @cl,blair,ne,us