Redevelopment Area #1B AIR, NEBRASKA REDEVELOPMENT AREA #1 REDEVELOPMENT PLAN FEBRUARY, 2002 PREPARED FOR: CITY OF BLAIR PREPARED BY: HANNA:KEELAN ASSOCIATES, P.C. Community Planning & Research Lincoln, Nebraska www.hannakeelan.com with assistance from Kevin S. Siebert, Attorney at Law Kirkham Michael, Engineers TABLE OF CONTENTS Table of Contents ................... ............................... i RedevelopmentPlan ................ ............................... 1 ExecutiveSummary ................. ............................... 1 1. Future Land Use Patterns ......... ............................... 8 2. Future Zoning Districts .......... ............................... 10 3. Recommended Public Improvements ............................... 12 4. Unified Elements of the Redevelopment Area #1 ..................... 16 5. Redevelopment "Action Plan" ..... ............................... 20 LIST OF ILLUSTRATIONS 1. Location Map ................... ............................... 7 2. Future Land Use Map ............ ............................... 9 3. Future Zoning Map .............. ............................... 11 Redevelopment Plan Redevelopment Area #1 i REDEVELOPMENT PLAN EXECUTIVE S UM3 ARY Purpose of Plan/Conclusion The purpose of this Redevelopment Plan is to serve as a guide for implementation of redevelopment activities within Redevelopment Area #1. Redevelopment activities associated with the Community Development Law, State Statutes, 18 -2101 through 18 -2154 should be utilized to promote the general welfare, the enhancement of the tax base, the economic and social well being, the development of any public activities and promotion of public events in the Area, along with any and all other purposes, as outlined in the Community Development Law. A Redevelopment Plan prepared for a Community Development Authority (CRA) must contain the general planning elements required by Nebraska State Revised Statues, Section 18 -2111 re -issue 1991 items (1) through (6). A description of these items are as follows: (1) The boundaries of the redevelopment project area with a map showing the existing uses and condition of the real property therein; (2) a land -use plan showing proposed uses of the area; (3) information showing the standards of population densities, land coverage and building intensities in the area after redevelopment; (4) a statement of the proposed changes, if any, in zoning ordinances or maps, street layouts, street levels or grades, or building codes and ordinances; (5) a site plan of the area; and (6) a statement as to the kind and number of additional public facilities or utilities which will be required to support the new land uses in the area after redevelopment. Furthermore, the CRA Redevelopment Plan must further address the items required under Section 18 -2113, "Plan; considerations ", which the CRA must consider prior to recommending a redevelopment plan to the Planning Commission and City Council for adoption. These "considerations" are defined as follows: "...whether the proposed land uses and building requirements in the redevelopment project area are designed with the general purpose of accomplishing, in conformance with the general plan, a coordinated, adjusted and harmonious development of the City and its environs which will, in accordance with present and future needs, promote health, safety, morals, order, convenience, prosperity, and the general welfare, as well as efficiency and economy in the process of development; including, among other things, adequate provision for traffic, vehicular parking, the Redevelopment Plan Redevelopment Area #1 1 promotion of safety from fire, panic, and other dangers, adequate provision for light and air, the promotion of the healthful and convenient distribution of population, the provision of adequate transportation, water, sewage, and other public utilities, schools, parks, recreational and community facilities and other public requirements, the promotion of sound design and arrangement, the wise and efficient expenditure of public funds, and the prevention of the recurrence of insanitary or unsafe dwelling accommodations, or conditions of blight." Onnoliicinn The Redevelopment Plan applies to Redevelopment Area #1 in Blair, Nebraska, which consists of the blight and substandard determination area. Illustration i delineates the Redevelopment Area. In essence, the area included in the Redevelopment Plan equals an estimated 707 acres. The Downtown and portions of the Highway 30, 75 and 91 corridors, including adjacent residential areas within the City of Blair are likewise included in the Redevelopment Area. The boundary description of the Area is as follows: The Redevelopment Area #1of the City of Blair, Nebraska, shall be described as follows: Beginning at a point on the west boundary line of Twenty- Fourth Street at the north /south mid point line of the east line of Block 18, Dexter's Addition; thence east through the north /south center line of Blocks 15, 16 and 17, Dexter's Addition and through the north /south center line of Larson Fourth Addition and the north /south center line of Lot 2, Block 14, Neff s Second Addition to a point on the west line of Twentieth Street; thence north along the west line of Twentieth Street to the northeast corner of the intersection of Wright Street and Twentieth Street; thence east on the north line of Wright Street and due east across Nineteenth Street to a point on the east line of Nineteenth Street; thence south/southeast along the east line of Nineteenth Street to the northwest corner of Block 19, Dexter's Second Addition; thence east on the north line of said Block 19, Dexter's Second Addition, to the east /west mid point of said north line of said Block; thence south to the center point of Block 19, Dexter's Second Addition; thence east along the north/south center line of Block 19, Dexter's Second Addition due east across Eighteenth Street to the northeast corner of Tax Lot 357; thence due north to a point on the west line of the Chicago Northwestern Railroad right -of -way; thence due east across the Chicago Northwestern Railroad right -of -way; east along the north line of Tax Lot 330 and due east across Seventeenth Street to the northwest corner of Block 94, Fifth Addition to the City of Blair; thence south along the west line of Block 94, to the north/south center line of said Block; thence east through the center line of Blocks 94 and 93, Fifth Addition, and due east across Fourteenth Street to a point on the east line of Fourteenth Street at the north/south center point of the west line of Block 92, Fifth Addition; thence south to the northeast corner of the intersection of Fourteenth Street and Park Street; thence east to the northwest corner of the intersection of Thirteenth Street and Park Street; thence north to the Redevelopment Plan Redevelopment Area #1 2 north/south mid point on the east line of Block 92, Fifth Addition; thence due east across Thirteenth Street and through the north/south center line of Blocks 91, 90 and 89, Fifth Addition; thence due east across Tenth Street to a point on the east line of Tenth Street; thence south along the east line of Tenth Street to the northeast corner of the intersection of Tenth Street and Iowa Street; thence east along the north line of Iowa Street to the point where said north line intersects with the right -of -way of the Chicago Northwestern Railroad; thence south/southeast to the southeast corner of the intersection of Fourth Street and new U.S. Highway 30; thence south along the east line of Fourth Street and due South across Grant Street to a point on the south line of Grant Street; thence west along the south line of Grant Street to the northeast corner of Tax Lot 199; thence south/southeast along the east lines of Tax Lot 199 and Tax Lot 198 to the east line of Tax Lot 198; thence south along the east line of Tax Lot 198 to the southeast corner of Tax Lot 198; thence west along the south line of Tax Lot 198 to the intersection of the east line of the Chicago and Northwestern Railroad right -of- way and the south line of Tax Lot 198; thence due north to a point on the south line of Grant Street; thence west' along the south line of Grant Street to the southeast corner of the intersection of Grant Street and Ninth Street; thence due south to a point on the east line of the Chicago Northwestern Railroad right -of -way; thence south/southeast along the east line of the Chicago Northwestern Railroad right -of -way to the intersection of the Chicago Northwestern Railroad right -of -way and the southwest corner of Tax Lot 198; thence due west across the Chicago Northwestern Railroad right -of -way to a point on the west line of the Chicago Northwestern Railroad right -of- way; thence south/southeast along the west line of Chicago Northwestern Railroad right -of -way to the northeast corner of Tax Lot 175; thence west along the north line of Tax Lot 175 to the northwest corner of Tax Lot 175; thence south along the west lines of Tax Lot 175, Tax Lot 22, and Tax Lot 225, and due south across U.S. Highway 75 /Calhoun Boulevard to a point on the south line of U.S. Highway 75 /Calhoun Boulevard; thence north/northwest along the west line of U.S. Highway 75 to the southeast corner Block 111. Eighth Addition; thence west along the south lines of Block 111, Eight Addition, Horbach's Addition, due west across Sixteenth Street, west along the south line of Hugley's Addition and Block 112, Eighth Addition, due west across Seventeenth Street and along the south line of Beaty's Addition and Block 113, Ninth Addition, to the southwest corner of Lot 113, Ninth Addition; thence north along the west line of Block 113, Ninth Addition, to the southeast corner of Rhoade's Park, thence due west along the south line of Rhoade's Park, due west across U.S. Highway 30 and west along the south line Davis Avenue to the southwest intersection of Davis Avenue and Twenty -First Street; thence due north across Davis Avenue and north along the east line Block 2, McMenemy's Second Addition to the northwest corner of South Street and Twenty -First Street; thence north across South Street and continuing north along the west line of Twenty -First Street (also the east. line of Block 2, T.M. Carter's Addition), to the northeast corner of Block 2 of T.M. Carter's Addition, thence west along the north line of said Block 2 to its intersection with the extended west line of Twenty -First Street, thence due north across Colfax Street and continuing north along the west line of Twenty -First Street one block north to Grant Street, thence due Redevelopment Plan Redevelopment Area #1 3 north across Grant Street to a point on the south line of Block 101, Original Town, thence east along the south line of Block 101, Original Town, to the northwest corner of the intersection of Twenty -First Street and Grant Street; thence north along the west line of Twenty -First Street to the southwest corner of the intersection of Washington Street and Twenty -First Street; thence west along the south line of Washington Street to the southwest corner of the intersection of Washington Street and Fontanelle Boulevard; thence north/northwest along the west line of Fontanelle Boulevard to a point on the west line of Fontanelle Boulevard which is due south of the east line of Tax Lot 247; thence due north across Fontanelle Boulevard and along the east line of Tax Lot 247 and across the Chicago Northwestern Railroad right -of -way to a point on the north line of the Chicago Northwestern Railroad right -of -way; thence east along the north line of the Chicago Northwestern Railroad right -of -way to the southeast corner of Lot 2, Block 6, Dexter's Addition; thence north along the east line of said Block 2, Lot 6, to the southwest corner of the intersection of Twenty- Fourth Street and Nebraska Street; thence north along the west line of Twenty- Fourth Street to the point of the beginning. The redevelopment planning process for the Redevelopment Area #1 has resulted in a comprehensive listing of planning and implementation recommendations. As previously discussed in the Blight and Substandard Determination Study, there are many existing land uses and structural and substandard conditions which are nonconforming in nature, detrimental to the health, safety and general welfare of the community and generally obsolete in respect to the development and living environment norms of today's Nebraska communities and the City of Blair. To eliminate these conditions and enhance private development activities within the Redevelopment Area, the City of Blair will need to consider the following general planning and redevelopment actions: * Encourage removal of substantially dilapidated and substandard structures within the Redevelopment Area; * Removal of excessive debris; * Rehabilitation of residential, commercial and industrial properties; * Improve public infrastructure to better service portions of the Area that have age and/or condition problems; * Encourage relocation of incompatible, socially undesirable land uses; Redevelopment Plan Redevelopment Area #1 4 * Continue the process of improving the overall efficiency of vehicular circulation within the Redevelopment Area, as identified in the Comprehensive Plan Update 2006; * Continue to improve traffic control measures along Washington Street (Highway 30/75) to further protect pedestrian and vehicular safety, while enhancing the environs of Downtown. Refer to the Proposed Bypass Alignments, March 2001 Blair Bypass Study - Phase II for additional information; * Establish a facade improvement program in the Downtown with highest priority given to buildings with historic significance; * Attain status as an Associate member of the Nebraska Lied Main Street Program, and eventually become a Main Street Community to expand access to technical assistance, as well as state and federal funding for historic preservation and adaptive reuse. efforts in the Downtown; * Emphasize landscaping and partial screening of parking areas within and adjacent the Downtown; * Identify appropriate areas for development of additional public parking areas in proximity to the Downtown, utilizing vacant property and property containing deteriorated structures; * Promote the development of housing and additional office space in upper floors of buildings within the Downtown. Target adjacent buildings for the potential of shared elevator and public use corridors; * Continue to develop and improve safe pedestrian routes to access the Downtown from adjacent residential neighborhoods to the north, south and west; * Develop a plan for screening and/or buffering of industrial areas from residential and public land uses; and * Develop more planned open spaces for public use and enjoyment. Redevelopment Plan Redevelopment Area #1 5 Implementation Both a time -line and budget should be developed for the implementation of the Redevelopment Plan. Each of these processes should be designed in conformance with the resources and time available to the City. A reasonable time -line to complete the redevelopment activities identified in the Plan would be 7 to 10 years. Various funding sources exist for the preparation and implementation of a capital improvement budget designed to meet the funding needs of proposed redevelopment activities. These include city and federal funds commonly utilized to finance street improvement funds, ie. Community Development Block Grants, special assessments, general obligation bonds and tax increment financing (TIF). The use of TIF for redevelopment projects in the Redevelopment Area is deemed to be an essential and integral element of the Redevelopment Area and use of TIF in connection with such projects is contemplated by the Plan and such designation and use of TIF will not constitute a substantial modification to the Plan. The City agrees, when approving the Plan, to the utilization of TIF by the Blair Community Redevelopment Authority for redevelopment projects and agrees to pledge the taxes generated in redevelopment projects for such purposes in accordance with the Act. Any redevelopment program receiving TIF is subject to a cost benefit analysis. TIF, as a source of public financing, ultimately impacts taxing authorities in the City of Blair and Lincoln County. Proposed redevelopment projects using TIF must meet the cost benefit analysis and the "But for" test. Accordingly, "But for TIF" a redevelopment project could not be fully executed and constructed in the community. Redevelopment Plan Redevelopment Area #1 6 < zo:< o< a: Q L z 8 w Of J EL a J m > W W O W o E y U 6 1. Future Land Use Patterns The existing land use patterns within the Redevelopment Area #1 were described in detail and depicted in Illustration 3 of the Blight and Substandard Determination Study. In general, the Redevelopment Area #1 consists of several land use types. The primary land uses are commercial, industrial, residential, vacant and public. The field survey revealed incompatible land uses in the estimated 707 acre Area, primarily from commercial and industrial uses against residential uses and areas. Illustration 2, the Future Land Use Plan, represents an effort to encourage land uses that stimulate future growth opportunities in the Redevelopment Area, while creating compatible land uses resulting in the efficient use of the physical features of the landscape. The recommended future land use classifications are generally in conformance with "The Blair Comprehensive Plan 2006." Commercial land uses are planned to remain in their current locations throughout the Downtown and along the primary transportation corridors, Washington and south Nineteenth Streets (Highway 30), Thirteenth and north Nineteenth Streets (Highway 75). Limited commercial uses, including commercial offices and professional offices, are encouraged along with a variety of residential uses in areas south and west of Downtown. These "transitional" areas are encouraged to lessen the impacts of Downtown Blair and major arterial upon adjacent residential streets neighborhoods. Industrial uses are primarily proposed to be located in their current locations, adjacent the Union Pacific Railroad corridor. Areas generally from Eighteenth Street east to the eastern boundary of the Redevelopment Area, north of the railway corridor to approximately State Street are included in this corridor. Additionally, areas in the southeast portion of the Redevelopment Area along Grant Street and a small area between Lincoln and Grant Streets between Tenth and Twelfth Streets are also identified as industrial land uses. Multifamily residential uses are identified in areas south of Downtown generally between Nineteenth and Fourteenth Streets and between Twelfth and Tenth Streets. Multifamily uses are also planned north of the Union Pacific railway corridor generally between Sixteenth and Nineteenth Street and between Twenty -Third and Twenty- Fourth Streets. An area of mobile home residential is identified along the eastern side of Tenth Street, from Grant Street south to nearly Butler Street. Single family residential uses are planned in the three remaining areas of the Redevelopment Area, in the northeast, the extreme southeast and western portions of the Area. Redevelopment Plan Redevelopment Area #1 8 L2 11 ri�� • = � :' _I�i -.iw i. •. ..� -i. =.�'- It ?i r li �.., "'.L2 �tyi AN Lj N � .. ' c � •• I' -_ .N — -•�' hF x` uu �L ?!_lp�5 i i" ' �� OCU D _ F LJ. Ell P IF] J!" IT L�L Li ULj Ll ED M U, u� u u� u u F] PF . FIFI nu WL Lju u�i Diu uu uu uu ,: Eu LIU IJU r- 71 u m v I E LiLl Rim FFMWH !Uri Ll LLI R X Ir F] F IF -1 , , u u H[J LJ LJ tJu \ � r : �I II I I Ll F1 - -771 E. FTI uu Li -j LI/ L uu - � II mvm � � °adq . I' I iuI_ ��iJ _ u u HLJ In pn CD CD rn > rn a rn 0 d The land area located within the Downtown commercial area, between Washington and Grant Streets contains a mixture of land uses and a variety of building types. It is recommended that substantially deteriorated structures in this described region and throughout the entire Redevelopment Area, those too deteriorated to rehabilitate, be replaced with new commercial or residential uses in conformance with the Future Land Use Plan. 2. Future Zoning Districts The recommended future zoning districts map for the Redevelopment Area #1 is identified in Illustration 3. Areas are depicted to be in conformance with the 2006 Comprehensive Plan Update and specifically with the proposed Future Land Use Plan, Illustration 2, of this document. The portion of the Redevelopment Area within the Downtown and adjacent residential and commercial uses south to Grant Street are recommended to be reclassified with separate commercial zoning districts. The commercial Central Business District (CCB) currently extends beyond Ninth Street, see the Existing Official Zoning Map, Illustration 4, within the Blight and Substandard Determination Study. It is the recommendation of this Redevelopment Plan to scale back the eastern CCB District boundary line to Fifteenth Street and reclassify the area east of Fifteenth Street as Agricultural/Highway Commercial District (A/CH). The commercial uses east of Fifteenth Street have sufficient front yard depths to meet the yard requirements of the A/CH District and are better. associated with the commercial uses contained in this highway commercial district. A four block area bound by Lincoln and Grant Streets, from Eighteenth to Fourteenth Streets is currently zoned Multi- family Residential High Density District (RMH). This area contains a variety of land use types including public /quasi - public, commercial, multifamily, single family and vacant uses. An additional two block area between Lincoln and Grant Street, from Fourteenth to Twelfth Street is currently zone as a CCB District (see Illustration 4) within the Blight and Substandard Determination Study, and contains commercial and single family land uses. These two areas are both advised to be reclassified as Limited Commercial (CL) in order to better represent the existing uses. Redevelopment Plan Redevelopment Area #1 10 ice � All _a�,l 3. Recommended Public Improvements The primary purpose for a Redevelopment Plan, accompanied with the preceding Blight and Substandard Determination Study, is to allow for the use of public financing in a specific area. This public financing is planned and implemented to serve as a "first step" for public improvements and encourage private development within the Redevelopment Area. The most common form of public improvements occur with infrastructure, specifically streets, water, sanitary sewer and storm sewer systems, sidewalks, open space and recreational uses. The major infrastructure concerns in the Redevelopment Area are street improvements, sidewalks, and the need for improvements to underground water, storm water, and sanitary sewer systems. The Redevelopment Area generally has a good grid system of streets providing adequate circulation patterns. However, in order to provide enhanced traffic circulation in the northerly portion of the Redevelopment Area, the widening of Nebraska Street should be considered. The estimated cost of this work is between $1,500,000 and $2,000,000, depending on the extent of the work. There are no other specific street improvement projects planned for the immediate future by the City. Streets throughout the Redevelopment Area are generally in good condition with a continued need for replacement, overlay, or relaying of the existing brick streets within the area. Approximately 10 percent of the streets are rated in poor and fair condition. An estimated 75 percent of the lots in the Redevelopment Area have sidewalks, however nearly 23 percent of the existing sidewalks are rated in poor and fair condition and are in need of replacement. As these streets and sidewalks continue to age, the potential of further deterioration and the potential for repairs and/or replacement will become increasingly necessary. A planned program of sidewalk improvement should be established in the Area which coordinates improvements with the One- and Six Year Road Plan and the Capital Improvement Program of the City. This process would allow Community Development Block Grants and tax increment financing to be used to finance public improvements. This would need to be a target. area of 100 homes or more to qualify for CDBG funds. Redevelopment Plan Redevelopment Area #1 12 Aging water, storm sewer, and sanitary sewer systems in the Redevelopment Area are and will continue to present maintenance and repair problems. As identified in the Blight and Substandard Determination Study, underground infrastructure is approximately 50 to 100 years of age. The City should identify areas of greatest priority and budget for selective reconstruction projects. Community Development Block Grants are one example of State and Federal funding programs that become economically viable in designated blight and substandard areas. The pooling of tax increment financing with other local private and public monies with sources of State and Federal programs can reduce the costs associated with expensive infrastructure repairs and or replacement. Streets The non -brick streets are generally in good to excellent condition. The existing brick streets need to have work performed in order to provide continued service in the area. There are generally three options to address the issues related to the brick streets. The first option is placement of a 2 -inch thickness asphalt overlay on the existing brick surface. The life expectancy of such a surface may range up to five years, depending on the condition of the brick and subgrade. The cost is approximately $10 per square yard. The second option is the removal of the existing brick and the inlay of either asphalt or concrete. Life expectancy of this option is estimated to range from 15 to 20 years, depending on the condition of the subgrade material. The cost of this option ranges from $20 per square yard for asphalt to $30 per square yard for concrete. The third option is the removal and resetting of the brick. This method is very labor intensive and will require ongoing maintenance to the brick surface throughout its life expectancy. The cost of this option can range up to $65 per square yard of brick surface. Assuming that nearly two miles of streets are in need of repair or replacement within the Redevelopment Area, then estimated construction costs could range from $350,000 for an asphalt overlay of these streets to $1,100,000 for concrete inlay streets to $2,000,000 for a combination of concrete inlay and brick removal and resetting. Construction costs could be even higher if the street subgrades are found to be in need of repair as well. Other considerations that would affect the cost estimates would include the amount of curb and gutter requiring replacement and storm drainage improvements that might be incorporated into the project. Federal STP funds could be utilized for this work. Redevelopment Plan Redevelopment Area #1 13 A detailed Street Condition Evaluation for the Redevelopment Area and City might be considered to prioritize the improvements. Sidewalks Sidewalk construction may include the construction of ramped curb cuts to provide enhanced accessibility to the area. Sidewalk construction costs are approximately $10 per linear foot with ramped curb cuts costing approximately $1,250 each. If a program is established to provide sidewalks in areas that currently do not have sidewalks and to replace existing deteriorated sidewalks, the construction costs could range up to $1,100,000. Construction of ramped curb cuts will require even more expenditures. Water In addition to the issues related to the 50 to 100 year old water system, it is estimated that nearly 30 percent of the water system in the Redevelopment Area consists of pipe that is less than 6 -inch in diameter. While water supply to the area is sufficient from the recently completed upgrades to the feeder system, the smaller mains restrict the flow in the area. This reduces the fire flows available from the fire hydrants and affects insurance rates to the property owners. Water quality issues can also arise due to the smaller mains, restricted circulation, and the lack of cement mortar lining in pre -1950 vintage mains in the system. The City is working to complete the inventory of the water system in conjunction with the continued development of the GIS system. Once the system inventory has been completed the City should establish a water main replacement program to continue the upgrade of the system. The cost associated with the replacement of water mains can range from $25 to $35 per linear foot. Fire hydrant costs are approximately $2,500 each and water valves cost approximately $750 each, depending on size. The minimum size of replacement water mains should be 6 -inch diameter for residential areas and 8 -inch diameter for commercial areas. If 30 percent of the water system is deficient in size within the Redevelopment Area, then costs of upgrading the system could range from $800,000 to $1,200,000. These costs do not include additional costs for replacement of the remaining 70 percent of the system which will continue to deteriorate in the future. No specific water main upgrade projects have been identified by the City. A Water Distribution System Master Plan update could help prioritize the needed improvements. Redevelopment Plan Redevelopment Area #1 14 Sanitary Sewer System The sanitary sewer system in the Redevelopment Area is generally in good condition. The recent construction of sanitary relief sewers has positively impacted the capacity of the remaining system to accommodate the sanitary flows. An Infiltration/Inflow (I /I) Study should be undertaken to determine if there are areas of the system subject to excessive inflow or infiltration and to identify areas where the structural integrity of the pipe is in question. This could include the use of TV cameras to identify problem areas. The results of the I/I Study could lead to the replacement of sections of the sanitary system to address specific concerns. A Collection System Master Plan update could help prioritize needed improvements. Sanitary sewer costs to replace existing system facilities can range from $50 to $60 per linear foot, depending on the size and depth of the sanitary sewer. Storm Sewer System Most of the storm sewer system in the Redevelopment Area is substandard. The City has attempted to address areas of immediate storm sewer concerns in conjunction with the construction of other street improvement projects. An example is with the widening of 10 Street north of Highway 30 to Nebraska Street, where a storm sewer system is being installed to address the storm drainage concerns in this area in conjunction with the street widening. The cost of storm sewer is dependent up on the size of the storm sewer pipe and on the number of inlets required. No specific storm drainage construction projects have been identified by the City within the Redevelopment Area. A detailed Storm Sewer Master Plan for the City could help identify the needed improvements and prioritize the implementation of the construction. Redevelopment Plan Redevelopment Area #1 15 4. Unified Elements of the Redevelopment Area #1 The Blight and Substandard Determination Study for the Redevelopment Area #1 analyzed the current conditions of the Downtown —its built environment, infrastructure and the overall condition of the Area. In general, the requirements of the Nebraska Community Development Law, which enables the use of tax increment financing, requires redevelopment plans to include a Future Land use Plan, Future Zoning Plan and a plan for public improvements. A syntheses of key issues and visions for the Downtown provided direction for the following unified elements of redevelopment efforts. Incentives for improvements to buildings are imperative to assist property owners to rehabilitate buildings and attract additional b asinesses to the Downtown area. Although there are very few vacant storefronts, under utilized second stories above street level are the result of deteriorating and functionally obsolescent buildings. However, many of these same buildings maintain their historic significance and are architecturally distinctive. All components that define the image and character of Downtown Blair should be addressed by a "program" for design improvement efforts. The following elements are representative of the priority redevelopment activities associated with the Redevelopment Area #1. Historic Preservation Tax Credits could be combined with tax increment financing incentives 'to further encourage facade improvements, rehabilitation of commercial buildings and to secure the future of the Downtown. Improvements to public infrastructure can be extended beyond streets, sidewalks and underground infrastructure. Lighting, benches, planters, landscaping, and signage are potential public improvement projects in the Downtown and throughout entire Redevelopment Area. Upper levels of downtown commercial buildings are generally under utilized, used for storage, or are vacant. Future redevelopment efforts need to provide incentives for the adaptive reuse of upper floors of commercial buildings. Public access from the ground level could provide elevator access to public corridors in upper levels of adjacent buildings. Downtown parking areas include on- street spaces, and public and private parking lots. The need for additional parking areas has been a re- occurring issue during the creation of this Redevelopment Plan. Areas with deteriorated structures and vacant parcels should be considered for future parking facilities. Redevelopment Plan Redevelopment Area #1 16 • Public improvements along the Thirteenth and Nineteenth Streets corridors are recommended to address landscaping, lighting, street tree planting and partial screening of parking lots to further enhance this transportation corridor. Conclusions A design improvement program should call attention to the Redevelopment Area #1 in the City of Blair, with emphasis upon the unique architectural and historic commercial characteristics of the Downtown. The role of the Downtown as the center of commerce and entertainment will foster an appreciation for its image, character and uniqueness in Blair and western Nebraska A successful Redevelopment Plan for the Downtown should guide redevelopment and development opportunities, while basing the viability of the Downtown on its historic foundation. New construction should not imitate historic styles or characteristics, but rather be compatible by similar materials, colors, heights and window, door and storefront designs. The Community Redevelopment Authority (CRA) and the City of Blair should seek funding sources to create a revolving loan and/or grant program for the rehabilitation and improvement of buildings and public uses in the Redevelopment Area. The rehabilitation of buildings would prolong the life of structures and enhance the visual appearance of the community. To prevent further decay, the Consultant recommends investment in all infrastructure systems to secure the entire Redevelopment Area. Prior to the transportation network improvements, the City and the CRA should develop a plan in conjunction with the City's Capital Improvement Plan and the One- and Six Year Street Plan to accommodate efficient infrastructure development and improvements The following identifies estimated costs for the improvement of various infrastructure features in the Redevelopment Area #1. Normal Street Replacement Costs are dependent on street width and thickness of pavement or overlay. Concrete paving of 6" thick with integral curbs costs an estimated $45 per square yard. Asphalt overlay has a cost of $3 per square yard, per inch of thickness of asphalt overlay. The cost to construct a 6" thick, 30' wide concrete street is $150 per linear foot The cost to construct a 6" thick, 60' wide concrete street is $300 per linear foot The cost to construct a 2" thick, 30' wide asphalt overlay is $20 per linear foot The cost to construct a 2" thick, 60' wide asphalt overlay is $40 per linear foot Redevelopment Plan Redevelopment Area #1 17 Ramped Curb Cuts $1,250 each Sanitary Sewer $50 to $60 per linear foot Water Valves $750 each Fire Hydrants $2,500 each Overlav of Parking Lots Asphalt overlay costs $3 per square yard per inch of thickness of asphalt overlay. Therefore the cost of a 2" overlay of a 150 x 150 foot parking lot is $15 Paved Alleys The cost for paved alleys is dependent on alley width and pavement thickness. A 6" thick concrete alley would cost $45 per square yard. The cost of a 6" thick, 16 foot wide concrete alley is $80 per linear foot. The cost of a 6" thick, 20 foot wide concrete alley is $100 per linear foot. Storm Sewers The cost of Storm Sewers is dependent upon the size of the storm sewer pipe and on the number of inlets required. A breakdown of approximate unit prices is as follows: 15" RCP costs $25 per linear foot 18" RCP costs $30 per linear foot 24" RCP costs $35 per linear foot 30" RCP costs $45 per linear foot 36" RCP costs $55 per linear foot 42" RCP costs $65 per linear foot 48" RCP costs $75 per linear foot Inlets cost $2,500 each Therefore, assuming 470 linear feet of 30" storm sewer and four inlets per block, a block of storm sewer would cost $31,150. (All above costs include Engineering fees) Cost estimates provided by Kirkham Michael Consulting Engineers Redevelopment Plan Redevelopment Area #1 18 This Redevelopment Plan addresses numerous community and economic development activities for the Redevelopment Area #1 in Blair, Nebraska. The 'major components of this Redevelopment Plan will be accomplished as individual projects, however, a comprehensive redevelopment effort is recommended. Just as the redevelopment efforts should be tied together, so should the funding sources to ensure a complete project. The use of state and federal monies, local equity and tax incentives coupled with private funding sources, can be combined for a realistic and feasible funding package. The following provides a summary listing of the types of funding to assist in implementing this Redevelopment Plan. Each selected redevelopment project should be accompanied with a detailed budget of both sources and uses of various funds. Building Improvement District Tax Increment Financing LB 840 or LB 1240 Historic Preservation Tax Credits Low Income Housing Tax Credits Sales Tax Community Development Block Grants (Including any unused Re -Use Funds) Local Lender Financing Owner Equity Small Business Association -Micro Loans Community Assistance Act Donations and Contributions Transportation Enhancement Act Private Foundations American Express Foundation Kellogg Corporate Giving Program Marietta Philanthropic Trust Monroe Auto Equipment Company Foundation Norwest Foundation Piper, Jaffray & Hopwood Corporate Giving Target Stores Corporate Giving Pitney Bowes Corporate Contributions Union Pacific Foundation US West Foundation Woods Charitable Fund, Inc. Abel Foundation ConAgra Charitable Fund, Inc. Frank M. and Alice M. Farr Trust Hazel R. Keene Trust IBP Foundation, Inc. Mid - Nebraska Community Foundations, Inc. Northwestern Bell Foundation Omaha World- Herald Foundation Peter Kiewit and Sons Inc. Foundation Thomas D. Buckley Trust Valmont Foundation Quivey -Bay State Foundation Redevelopment Plan Redevelopment Area #1 19 5. Redevelopment "Action Plan" HISTORIC PRESERVATION ACTIONS TO BE IMPLEMENTED SCHEDULE PARTICIPANTS Facade Improvement Establish program which combines the resources of 2002 CRA, Property Program the local architectural and design services with the Owners and local funding potential of Tax Increment Financing. lenders Schematic designs supportive of architectural elements of individual buildings List Downtown on Preservation Tax Credits is vital to providing 2003 Blair Chamber of the National Register incentives to property owners to preserve, Commerce, CRA of Historic Places rehabilitate or adaptively reuse buildings in and the State Downtown Blair. Historic Preservation Tax Credits Historic used in combination with Tax Increment Financing Preservation Office will better enable redevelopment of Downtown buildings. Historic Consider the use of multiple property or historic 2002-2004 Property Owners, Neighborhoods district nominations of residential areas to the CRA, City of Blair, National Register of Historic Places. Access to NE Dept. of historic preservation tax credits, combined with tax Economic Dev., increment financing and potentially Community and the State Development Block Grants for housing rehabilitation Historic could pool local, state and federal monies to improve Preservation Office neighborhood conditions Historic Theme Create an historic theme, or identity, by which 2002-2003 Chamber of Downtown Blair is identified. Correlations between Commerce signage, marketing and advertising should all be tied together to promote the Downtown. BUSINESS DEVELOPMENT Market the potential of Downtown Blair to recruit 2002-2012 Chamber of New Businesses new and vibrant businesses and speciality shops to Commerce, occupy vacant storefronts and, or, buildings. Washington Although service and professional businesses are County Economic appropriate, retail and restaurant uses are vital in Development and establishing the Downtown as a destination for Blair the City of Blair and northeast Nebraska residents Upper Level Under utilized upper levels of commercial buildings 2002-2008 Property Owners, Development should be considered for a variety of different uses. CRA and Chamber Service and Professional commercial uses not reliant of Commerce upon street level accessibility would be ideally suited for upper level occupancy. Multiple buildings could be serviced with public access corridors which share centralized elevator cores. Incubator Business Work with current property owners or acquire a 2002-2005 Property Owners, Building building for this purpose. Retail space would be Chamber of leased at a reduced cost to start -up or growing Commerce businesses, which once firmly established, would relocate to other buildings in the Downtown. Highway Limit highway commercial uses to the Washington 2002 Planning Commercial Uses Street (Highway 30) corridor east of Fifteenth Street. Commission, City This would further secure the viability of the Council and Downtown as a late nineteenth century historic Property Owners commercial center. Redevelopment Plan Redevelopment Area #1 20 BUSINESS DEVELOPMENT ACTIONS TO BE IMPLEMENTED SCHEDULE PARTICIPANTS Cooperative Businesses in the Downtown should establish 2002-2003 Business Owners, Marketing uniform business hours and jointly advertise sales, Chamber of special events and promotion. Emphasize the Commerce diversity of Downtown Blair by including service and professional businesses along with the promotional efforts of the retail establishments Commercial Uses as Promote the development of limited commercial uses 2002 - 2012 City of Blair, CRA, Buffers along Nineteenth and Thirteenth Streets, and to a Property Owners, more limited extent, between Lincoln and Grant and Neighborhood Streets from Eighteenth to Fourteenth Streets. Associations Professional offices limited to one story in height would serve to lessen the negative impacts of Downtown and major arterial streets from adjacent residential neighborhoods. Limited Industrial Limit the development of future industrial uses to 2002-2012 Planning Uses those which are "light" industrial. Locations of light Commission, City industrial uses should be limited to the north side of Council and the Union Pacific Railroad corridor, generally south Property Owners of State Street. The extreme eastern portion of the Redevelopment Area, south of the railway corridor, is also proposed as light industrial development areas. Railway Corridor Promote the use of additional screenage and 2002-2006 Property Owners, Industrial Uses landscaping mechanisms to lessen the negative CRA, City of Blair impacts of outside storage areas upon adjacent commercial and residential areas. HOUSING OPPORTUNITIES New housing Multifamily residential uses are encouraged to be 2002-2012 Planning Construction implemented south of the Downtown and in selected and beyond Commission, City areas north of the railway corridor. Substantially Council and deteriorated single family dwellings should be Property Owners considered for replacement with multifamily residential uses. Housing Access to cost effective methods for moderate and, or 2002 - 2012 Property Owners, Rehabilitation and substantial rehabilitation of single family dwellings and beyond City Council, CRA Demolition should be provided to residences in the and NE Redevelopment Area. However, substantially Department of deteriorated dwellings, not cost effective to rehab, Economic should be targeted for replacement. The combination Development of Tax increment Financing, CDBG funding„ private equity and local lending institutions should be combined to effective provide incentives for property owners to rehabilitate their dwellings. Housing Locations currently identified vacant property, or 2002-2012 CRA, Planning development properties where existing buildings are determined and beyond Commission, City opportunities "not cost effective for rehabilitation ", should be Council and replaced with appropriate single and multiple family Property Owners residential uses in accordance with the Future Land Use Plan. Redevelopment Plan Redevelopment Area #1 21 PUBLIC IMPROVEMENTS ACTIONS TO BE IMPLEMENTED SCHEDULE PARTICIPANTS Sidewalk Expand upon the Downtown sidewalk improvements 2002-2010 Property Owners, Repair /replacement by making connections to adjacent residential City Council, CRA neighborhoods. Priority should be place upon major arterial and collector streets. A sidewalk improvement program should be implemented in phases throughout the entire Redevelopment Area. Street Condition Conduct a Street Condition Evaluation of all streets 2002-2004 City of Blair within the Redevelopment Area, and potentially the City of Blair as a whole. A completed study of this nature would allow the City to coordinate street improvements with the Capital Improvements Plan and the One and Six Year Roads Plan. Trails and Safe Develop trails along abandoned Chicago & 2003-2007 Planning Pedestrian Routes Northwestern Railroad corridor, designated street Commission, City routes and separated on road routes in conformance Council, CRA and with the Blair Trails Plan. Connections between the the City and State Redevelopment Area, the City as a whole and regional Wide Trails Plans trail systems will enhance recreation and economic development potentials Nebraska Street Traffic circulation improvements in the northerly 2005-2006 CRA, City of Blair portion of the Redevelopment Area should be enhanced by the widening of Nebraska Street. Sidewalk improvements should be coordinated with the Street improvements Brick Streets Streets in general throughout the Redevelopment Area 2003 - 2006 City of Blair, are in good condition. However, brick surface streets CRA, Property are in need of improvements. Asphalt overlay, Owners concrete paving or resetting the brick streets are options available the community. Highway 30 Bypass Continue to seek out all methods to further the 2002-2008 City Council, development of an Highway 30/75 Bypass around the Planning community. Heavy truck traffic and highway Commission, City travelers could be diverted from Downtown, relieving Administration the congestion vehicular traffic. and NE Dept. of Roads East Highway 30 Encourage additional landscaping and street scape 2002-2004 Property Owners, improvements to enhance the appearance of the CRA and City of Highway 30 corridor east of Fifteenth Street. Low Blair height shrubbery or other screening techniques should be utilized to partially screen parking and outside storage areas. Redevelopment Plan Redevelopment Area #1 22 PUBLIC IMPROVEMENTS ACTIONS TO BE IMPLEMENTED SCHEDULE PARTICIPANTS Public Parking Evaluate the potential of creating additional public 2002-2004 CRA, Property Areas parking lots in selected areas within, nor adjacent to Owners Downtown. Provisions should be made for both employee and public parking. Traffic Control Expand street and sidewalk improvements to enhance 2003 - 2007 City of Blair, CRA, the visual character and better control traffic along Property Owners Nineteenth and Thirteenth Streets (Highways 30 and 75). Work the State Roads Department to lower posted speeding limits which are more appropriate in urbanized areas. Underground Implement a phased program of utility analysis and 2004-2012 Utilities replacement, if needed. Water, sanitary sewer and storm sewer system improvements should be coordinated with street improvement projects. Thirty percent of the water mains, as an example, are less than 6 inches in diameter and should be replaced for proper fire protection. City of Blair, CRA, Property Owners, and the NE Dept. of Economic Development Redevelopment Plan Redevelopment Area #1 23