Loading...
MS-2013-00437.tif To:4024264195 P.1r1 DEC-11-2007 18�3Q From: Oct, 1h. '1013 Y GUAM GI I G; 8L A1R (402. 426. 4 19 1) No. 1400 P. 1 2009 INTERNATIONAL RESIDENTIAL CODE - C bF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Hall prierato Final inspection � 218 3 1 Gtn S treet, B lair, NE 68008 Because of ltpttifafians caused by the Infeasfhility to perform datalled Inspections which would j not interfere with reroofing work, pletass indleate compliance wlth the following requirements followlna thla raroofirig job. Permit #: Installation Datct: / e1 YES NO The materials and methods of application cised for recovering or replacing the existing roof covering comply with the requlremento of the building 00d0. (8007.1) I PRt3TECTION INSTA ; An ice Harrier that consists of et Fast two layers of underlayrnmilit or of u self adhering polymer modified bitumen sheet weL i nctplla and extends at least from the eave's edge to a point at lest 24 inches inside the exterior wall line of the building. (11905,211) ST S0UN ' 'i'ho struotUml rant components are capable of suppoi't1;7g the roof covering system and the material land equipment loads that will be oncountered du lrio installation of the roof syaterri. (8907.2) i 6IS71N blil RING WAS REMOVE Existilig roof nnvpri� was removed for Ono of the re�riz►si is required by section 8907.3 NO RUSTF-0 MnJA OR PL AS NG: Existing vent fleshing, metal Gdges, drain autiets, cailara or metal counter- flasliing w©ro not rainstelled if rusted. (R907.6) C] iri - .A3H1 1 LLEQ PROPERLY: Rashhig shall be r000nstructed in accordanea with approved manufacturer's installation InstruQ011 Metal flashing to which biturninoras materials are to blN adhered shall be primed prior to installatlon. (R907.6) SignRture of Primary ns akr Date Signature of Permit Holdsr ' I � I