Loading...
2006-07ATTEST: b z,-6,(,64 BRENDA R. WHEELER, CITY CLERK RESOLUTION NO. 2006 - 7 COUNCILMEMBER FANOELE INTRODUCED THE FOLLOWING RESOLUTION: WHEREAS, pursuant to Resolution No. 2005 -6, the Mayor and City Council of the City of Blair, Nebraska, adopted the Year 2005 One and Six Year Plan for the construction and maintenance and repair of the streets of the City of Blair, Nebraska. WHEREAS, certain amendments have been made to said One and Six Year Plan necessitating an amendment to such Plan. BE IT RESOLVED by the Mayor and City Council of the City of Blair, Nebraska, that the Year 2005 One and Six Year Plan for the construction and maintenance and repair of the streets of the City of Blair, Nebraska, as prepared by the City Street Superintendent and dated February 8, 2005, be and hereby is amended to add the project listed on the "Form 10" attached hereto and incorporated by this reference herein. BE IT FURTHER RESOLVED that the amendments to said One and Six Year Plan be filed with the Department of Roads, State of Nebraska. COUNCILMEMBER ABBOTT MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCILMEMBER BIFFAR. UPON ROLL CALL, COUNCILMEMBERS STEWART, SCHEVE, SHOTWELL, FANOELE, ABBOTT', MCMANIGAL, BIFFAR AND WOLFF VOTING "AYE ", AND COUNCILMEMBERS NONE VOTING "NAY", THE MAYOR DECLARED THE FOREGOING RESOLUTION WAS PASSED AND ADOPTED THIS 14 DAY OF FEBRUARY, 2006. 1 CITY OF BLAIR, NEBRASKA ES E. REALPH, MAYOR (SEAL) STATE OF NEBRASKA ) ) WASHINGTON COUNTY ) :ss: BRENDA R. WHEELER, hereby certifies that she is the duly appointed, qualified and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said city held on the 14th day of February, 2006. 2 % R ohidex_.- � BRENDA R. WHEELER, CITY CLERK BOARD OF PUBLIC ROADS CLASSIFICATIONS AND STANDARDS FORM 10 NOTIFICATION OF REVISION OF ONE -YEAR PLAN ICl REASON FOR REVISION: Paving of Skyline Drive Blair LOCATION DESCRIPTION: South end of existing Skyline Drive south for 1450 feet EXISTING SURFACE TYPE AND STRUCTURES:(such as dirt, gravel, asphalt, concrete, culvert or bridge) Dirt AVERAGE DAILY TRAFFIC: CLASSIFICATION TYPE: (as shown on Functional Classification Map) 20 = _ , 20 = Local PROPOSED IMPROVEMENT DESIGN STANDARD NUMBER: RL2 SURFACING: 7" THICKNESS 25' WIDTH CULVERT: SIGNATURE: X GRADING X CONCRETE X RIGHT OF WAY ,AGGREGATE X CURB & GUTTER X UTILITY ADJUSTMENTS ARMOR COAT X DRAINAGE STRUCTURES _ FENCING . ASPHALT X EROSION CONTROL SIDEWALKS BRIDGE TO REMAIN IN PLACE NEW BRIDGE: BOX CULVERT: ESTIMATED COST (IN THOUSANDS) Project Length = *C *CITY *STATE *FEDERAL 200 *OPTIONAL (Nearest Tenth) PROJECT NUMBER: 027 (State Unit of Measure) 1. TITLE: Director of Public Works Page 1 "OTHER 'VILLAGE: LIGHTING ROADWAY WIDTH LENGTH TYPE ROADWAY WIDTH LENGTH TYPE SPAN RISE LENGTH TYPE DIAMETER LENGTH TYPE YES I 1N /A Bridges and Culverts Sized Li Hydraulic Analysis Pending OTHER CONSTRUCTION FEATURES Construction of PCC pavement in existing ri of -way including storm sewer DATE: TOTAL 200 B- 99.0(-05)