Loading...
AD-2011-00038_0001.tif /s 01 i CargillInc April 8, 2013 PO Box 3 00 &J"'r t4 I i RE: Permit AD- 2011 -00038 Addition to Polyols Building to be used forprocessing. Expiration Date: 5/11/2013 Dear permit holder, This letter is to inform you that the above referenced permit will expire on the Expiration Date shown above. Please be advised that you will need to contact our office no later than the Expiration Date shown above to renew this permit for an additional one (1) year period, or to notify us that you will no longer be continuing this project. Renewal fees range from $150 - $400, depending upon the original valuation of the project. A maximum of two (2) renewals can be purchased. If you will no longer be continuing this project, a final inspection must be scheduled to ensure that the structure meets the minimum standards required by the Property Maintenance Code. Enclosed, please find a copy of the building permit and inspection record (if any) for your reference. If you have any questions regarding this issue, feel free to contact me at 402 - 426 -4191. Thankyou in advance for your cooperation inthis matter. Sincerely, Phil Green Assistant CityAdministrator Cc: City Attorney PipOFlVpi�i 218 Soufl) 1 6th Street 6 Blair, Nebraska 68008 0 402 - 426 -4191 « Fox 402- 426 -4195 n E -rnail cityofblair @cirblairrne,us