2012-35RESOLUTION NO. 2012- 35 PRELIMINARY ENGINEERING SERVICES AGREEMENT — BK1254 SUPPLEMENTAL AGREEMENT NO. 1 COUNCIL MEMBER STEWART INTRODUCED THE FOLLOWING RESOLUTION: Whereas: City of Blair and Felsburg, Holt & Ullevig have previously executed a preliminary engineering services Agreement BK1254 for a transportation project for which the Local Public Agency (LPA) would like to obtain Federal funds; Whereas: City of Blair understands that it must continue to strictly follow all Federal, State and local laws, rules, regulations, policies and guidelines applicable to the funding of this Federal -aid project; and Whereas: City of Blair and Felsburg, Holt & Ullevig wish to enter into a preliminary engineering services supplemental agreement setting out modifications and/or additional duties and/or funding responsibilities for the Federal -aid project. Be It Resolved: by the City Council of the City of Blair, Nebraska that: James Realph, Mayor of the City of Blair, Nebraska is hereby authorized to sign the attached Preliminary Engineering Services Agreement Supplement No. 1 between the City of Blair and Felsburg, Holt & Ullevig. City of Blair is committed to providing local funds for the project as required by the Project Program Agreement and any Supplemental Project Agreements. NDOR Project Number: URB- 6462(1) NDOR Control Number: 22507 NDOR Project Description: Jackson Street, P — River Road, Blair COUNCIL MEMBERSTEWART MOVED THAT THE RESOLUTION BE ADOPTED AS READ, WHICH SAID MOTION WAS SECONDED BY COUNCIL MEMBER HALL. UPON ROLL CALL, COUNCIL MEMBERS SHEPARD, STEWART, RYAN, STEWART, CHRISTIANSEN, JENSEN, HALL AND WOLFF VOTING "AYE ", AND COUNCIL MEMBERS NONE VOTING "NAY ", THE MAYOR DECLARED THE FOREGOING RESOLUTION PASSED AD ADOPTED THIS 27 DAY OF NOVEMBER, 2012. CITY OF BLAIR, NEBRASKA J I E E. REALPH, MAYOR ATTEST: BkVNDA R. WHEELER, CITY CIERK (SEAL) STATE OF NEBRASKA ) ) :s: WASHINGTON COUNTY ) BRENDA WHEELER, hereby certifies that she is the duly appointed, qualified and acting City Clerk of the City of Blair, Nebraska, and that the above and foregoing Resolution was passed and adopted at a regular meeting of the Mayor and City Council of said City held on the 27th day of November, 2012. A4� 6_ - BRENDA R. WHEELER, CITY CLERK SUPPLEMENTAL AGREEMENT #1 PRELIMINARY ENGINEERING SERVICES CITY OF BLAIR, NEBRASKA FELSBURG, HOLT & ULLEVIG PROJECT NO. URB- 6462(1) CONTROL NO. 22507 JACKSON STREET, 3 RD — RIVER ROAD THIS SUPPLEMENTAL AGREEMENT, made and entered into by and between the City of Blair, Nebraska, hereinafter referred to as the Local Public Agency or "LPA," and Felsburg, Holt & Ullevig, hereinafter referred to as the "Consultant." WHEREAS, the Consultant and the LPA entered into Engineering Agreement BK1254 executed by the Consultant on March 26, 2012, and executed by the LPA on March 21, 2012, hereinafter referred to as the "Original Agreement ", providing for preliminary engineering services for Project No.URB- 6462(1), and WHEREAS, it is necessary that Wetland Delineation, 404 Permit, Additional Right -of- Way, Title Searches and Guardrail Design not contemplated in the Original Agreement, be added under this supplemental agreement, and WHEREAS, it is necessary to increase the Consultant's compensation by this supplemental agreement for the additional work necessary to complete the project, and WHEREAS, it is the desire of the LPA that the project be constructed under the designation of Project No. URB- 6462(1), as evidenced by the Resolution of the LPA dated the R day of N010 ) 2012, attached and identified as EXHIBIT "A' and made a part of this agreement, and NOW THEREFORE, in consideration of these facts, the Consultant and LPA agree as follows: SECTION 1 . A Written Notice -to- Proceed was issued to the Consultant on September 24, 2012 to perform the additional work through Consultant Work Order 1. Any additional work or services performed by Consultant on the project prior to the date specified in the written Notice -to- Proceed is not eligible for reimbursement. The Consultant will perform the additional work stipulated in Consultant Work Order 1, which is attached as Exhibit "B" and hereby made a part of this supplemental agreement. SECTION 2 . A Written Notice -to- Proceed was issued to the Consultant on October 24, 2012 to perform the additional work through Consultant Work Order 2. Any additional work or services performed by Consultant on the project prior to the date specified in the written Notice -to- Proceed is not eligible for reimbursement. The Consultant will perform the additional work stipulated in Consultant.Work Order 2, which is attached as Exhibit "C" and hereby made a part of this supplemental agreement. 9K1254 SECTION 3 . For the work required, Section 6 of the Original Agreement is hereby amended and the fixed - fee - for - profit is increased from $8,667.84 to $9,901.61, an increase of $1,233.77. Actual costs are increased from $93,432.16 to $104,738.39, an increase of $11,306.23. The total agreement amount is. increased from $102,100 to $114,640, an increase of $12,540, which the Consultant must not exceed without the prior written approval of the LPA. SECTION 4 . The Consultant will be paid the additional fee on the same terms stipulated in the Original Agreement and, except as specifically amended by this supplemental agreement, all terms and conditions of the Original Agreement on Project No. URB- 6462(1), executed by the Consultant on March 26, 2012 and executed by the LPA on March 21, 2012 shall remain in full force and effect. Project No. URB- 6462(1) -2- Agreement No. BK1254 Control No. 22507 Supplement No. 1, Jackson Street, 3`d — River Road IN WITNESS WHEREOF, the parties have caused these presents to be executed by their proper officials thereunto duly authorized as of the dates below indicated. After being duly sworn on oath, I do hereby acknowledge the foregoing certification and state that I am authorized to sign this agreement for the firm. EXECUTED by the Consultant this day of ��l e -�,P� ' 2012. FELSBURG, HOLT & ULLEVIG Kyle A. Anderson, PE CITY OF BLAIR James Realph M yor Subscribed and sworn to before me this ? day of NO 1 �e K , 2012. � k) �AA�- Clerk STATE OF NEBRASKA DEPARTMENT OF ROADS Form of Agreement Approved for Federal Funding Eligibility: �Z Z Date Project No. URB- 6462(1) -3- Agreement No. BK1254 Control No. 22507 Supplement No. 1 Jackson Street, 3 ` — River Road Consultant Work Order (Local Projects) Pircipci No.: Control Nlo.: URB-6462(1) 22507 (Nam-i and I Ayreament No`.: Work Order No.: (i.e., soc note below) Fplsburg Holt & Ullevio/ K%)Iil Anderson, PE 2 Estimate LPA: (Manie and Raprescrilativo) Constr. Change order No.: (itapplit. City of Blair/ At Schoemaker All parties agree the following described work needs to be per-formed by the consultant as part of the referenced project. All parties concur and hereby give notice to proceed based on the following: justification to modify contract, scope of services, deliverables, schedule, and estimated total fee, All otherlerms of existing agreements between the parties are still in effect. It is understood by all parties that the work described herein will become part of a future supplement to the agreement indicated above. Justification to modify aqraernent; (Include scope of services, riolivatables, DridurchadVIC) The purposo of this wotl( order is to add the Scope and Fee to complete the Title Search. The Consultant had Midwest ROW on board to complete tho ROW Services, including the Title Searches. During Post Negotiations, we were instructed to remove Midwost ROW from our contract, that the City Would contract with thern directly. This, inadvertently left US Without Title Soarchos, This Work Order adds back the Title Searches for 34 tracts at $60/tract completed by Blair Abstract & Title, Work Title and Tolzi Fee (from Task Order) Comments Summar of Fee A, T olzil Dircct Labor Cost 0.00 B. Overhead (Factor' xA) 0.00 Title Search for 34 tracts, completed by Blair Abstract & 1 C. A + 0 0.00 D. Profit/Fee (Factor — x C) 'Overhead Factor: 155.413% E. Direct Non-l-nhor Cost "Profit/Fee Factor: I 13.40% Ncita- Work Orders are either "Estimated Total Fee• or "Final Total Fee". it a Wori Order is an estimate, the cost will be finalized "Vilen work is lurthei defined and negotiated; it's number is folloviod by "Estimate ", for example, Work Order No. 5 Estimate. Once the work is finalized, the Work Order No. is shown as 5 Final and the rant estimate documentation should be attached. F. Subcon sultant Services TOTrAL FEE: C I. D • E + F EXI ESTIMATED TOTAL FEE: FINIAL TOTAL FEE: Work 04-der Authorization — May be granted by email and• attached to this document. cons,milant: A ILI — LPA: Nam Sli;Iluj 1W Onio NDOR 1`1cpresentative: Notice to Proceed will be g ranted b ........ .. Je.n.alfer ........ .. . ............ email b LPD PC. D*aln' FHWA: Thompson Notire to Proceed Date: rr-z I C) (Z 4 Oct. 24, 2012 1 Distribution: Consultant, LRA - RC, NDOR - Project Rep., Fl-II.NIA, N0011•Li"D PC, NE:011 Agraomonls En9r. DR Forin 246, Jun 10 0,00 0.00 2,040,00 $2,040.00 EXHIBIT T" Page 1 of 1 Co nsulta nt r r r (Local Projects) Project No.: Control No.: URB•6462(1) 22507 Consultant: (Name and Representative) Agreement No.: work Order No.: (i.e., see note below) Felsburg Holt & Ullevig/ Kyle Anderson, PE LPA: 1 Estimate LPA: (Name and Representative) Constr. Change Order No.: (If applicable) City of Blair/ Al Schoemaker _ ............. All parties agree the following described work needs to be performed by the consultant as part of the referenced project. All parties concur and hereby give notice to proceed based on the following: justification to modify contract, scope of services, deliverables, schedule, and estimated total fee. All other terms of existing agreements between the parties are still in eff ect. If is understood by all parties that the work described herein will become part of a future supplement to the agreement indicated above. Justification to modify agreement: (Include scope of services, deliverables, and schedule) The purpose of this work order is to add the Scope and Fee to complete a Wetland Delineation and 404 permit. The original scope included a Wetland Determination only. In addition, the original scope identified preparing proposed ROW, tract drawings and legal descriptions for up to 5 Tracts. At the plan -in -hand we identified 8 tracts needing ROW. This work order includes adding the additional 3 tracts, Finally, guardrail will be added to the plans at one location. Please see attached Scope of Services for additional explaination and detail. Work Title and Total Fee (from Task Order) Comments Summary of Fee will be ranted b email by LPD PC A. Total Direct Labor Cost 3,603.89 B. Overhead (Factor * x A) 5,603.33 Wetland Delineation and 404 Permit, 3 additional ROW C. A + B 9,207.22 Tracts, & •Guardrail Design D. Profit/Fee (Factor ** x C) 1,233.77 - - — _ - -- am _ Ne *Overhead Factor: 155,48% E. Direct Non -Labor Cost 59.01 * *Profit/Fee Factor: 13.40% F. Subconsultant Services 0.00 Note: Work Orders are either "Estimated Total Fee" or "Final Total TOTAL FEE: C + D + E + F $10,500.00 Fee". If a Work Order Is an estimate, the cost will be finalized when work is further defined and negotiated; it's number is followed by ®ESTIMATED TOTAL FEE: "Estimate ", for example, Work Order No. 5 Estimate. Once the ❑ FINAL TOTAL FEE: work is finalized, the Work Order No. is shown as 5 Final and the cost estimate documentation should be attached. Work Order Authorization — May be granted by email and attached to this document. DR Form 246, Jun 10 EXHIBIT "Brr Page 1 of 6 a e Signature Date LPA: _ ............. _ ��1, ,��. ......... Name Signature Date NDOR Representative: Notice to Proceed J �Y1{'11 T �� Digitally signed by JenniferThompson DN:cn= JenniferThompsono Nebraska will be ranted b email by LPD PC Name Division, Signature Date ` _e malkjennifer .thompson @nebmska.gov, FHWA• Thompson, Date: 2012.09.1908:27:55 -05'00' D'igitallysigne�r by Frank M. F ch 9 -24 -2012 DN: cn =Frank M. Rich, o =Fed ral - - — _ - -- am _ Ne Signature Hig r riw "iflistfatiori, o hFf u a a Division, J M F emall =frank.rich @dot.gov, c =US C Date: 2012.09.2408:45:38 -05'00' Distribution: Consultant, LPA — RC, NDOR — Project Rep., FHWA, NDOR -LPI F',(' NDOR Agreements Engr. DR Form 246, Jun 10 EXHIBIT "Brr Page 1 of 6 DESCRIPTION OF PROJECT AND SCOPE OF SERVICES FOR WORK ORDER #1 PROJECT: JACKSON AND BLAINE STREET IMPROVEMENTS, BLAIR PROJECT NUMBER: URB- 6462(1), CONTROL NO. 22507 DESCRIPTION OF TASKS AND ASSUMPTIONS The purpose of this Consultant Work Order is to add the Scope and Fee to complete a Wetland Delineation and 404 permit, add 3 additional Right -Of -Way Tracts, and design guardrail to protect a railroad bridge pier along Marina Drive. The original scope included a Wetland Determination only. During preliminary design is was determined that approximately 0.9 acres .of wetlands would be disturbed with this project requiring a full delineation and a 404 permit. In addition, the original scope identified preparing proposed ROW,..tract drawings and legal descriptions for up to 5 Tracts. At the plan -in -hand we identified 8 tracts needing ROW. This work order includes adding the additional 3 tracts. Finally, at the plan -in -hand, it was determined that guardrail would be necessary to protect the railroad bridge pier along Marina Drive. This work was not identified in the original scope of services. Below is the complete description of tasks. DESCRIPTION OF TASKS Increase scope from a Wetlands Determination to a Wetlands Delineation 1.1 Wetland Delineation - Small. Complete Wetland Delineation Report, data forms, photolog, GPS Mapping, geodatabase files, revisions, internal QA/QC. 1.2 404 Nationwide Permit — Prepare permit application package. Does not include pre- application meeting or on -site meeting. 2. Three (3) additional ROW Tracts 2.1 Proposed ROW — the Consultant will determine the easements (temporary and permanent) and right -of -way required to construct the project for the 3 additional tracts. 2.2 Right of Way Tract Drawings & Legal Descriptions — The Consultant will prepare individual right -of -way Tract Drawings and Legal Descriptions for each easement (temporary or permanent) and right -of -way required to construct the project for these 3 additional tracts. 3. Guardrail Design 3.1 This task includes the effort to design the guardrail to protect the railroad bridge pier along Marina Drive. This task includes designing the guardrail, preparing detailed guardrail layout sheets in the plan set, and computing all quantities associated with this guardrail installation. Project No. URB - 6462(1), CN 22507 Jackson & Blaine Street Improvements, Blair Work Order #I EXHIBIT "B" Page 2 of 6 WORK ORDER #1 Consultant's Estimate of Hours Project Name: Jackson and Blaine Street Improvements Project Number: URS- 6462(1) Control Number: 22507 Location (City, County): Blair, Washington County ® FELSBURG Firm Name: Felsburg Holt &Ulievig Consultant Project Manager: MatlMcFadden H 0 LT & PhonelEmail: 402.445.44051 matl.mcfadden @fhueng.com U L L G V I G LPA Responsible Charge: Allen Schoemaker PhonelEmail: ( 402)426- 41911ars @ci.blalr.ne.us 1.1 Welland Delineation -Small NDOR Project Coordinator: Jason Freldrichs Om PhonelEmail: ( 402) 479- 3650rjason.freldrichs @nebraska.gov Date: September 18, 2012 0 CLASSIFICATIONS': PR = Principal SENG = Senior Engineer UD1 = User Defined 1 SENV = Senior Environmental Scientist ENG = Engineer UO2 = User Defined 2 ENV Environmental Scientist SDES = Senior Designerrrechnician UD3 = UserDerined3 ADM = Administrative DES = Designerrrechnician *For Project Manager, use one or the technical classifications -For User-Defired Classifications, you will need to edit the Classifications Legendlocaled above. To entera new classification, replace'UDi'Wlth its abbreviation (ex. GRA) and replace "User Defined 1' with the corresponding title (ex. Graphic Artist). Once the user - definitions are added, They will self - populate the Estimate of Hours table, as well as the remaining sheets. EXHIBIT "B" Page 3 of 6 fimaFTIT-rm 1.1 Welland Delineation -Small Om 0 .,. Nationy4de Permit Om 2. Three (3) Additional ROW Tracts 2.1 Proposed ROW 2.2 Tra nd Legal Descriptions 3. Guardrail Desig 3.1 Guardrail Design 4. Project Management Total Hours Total Days (0 hrs) CLASSIFICATIONS': PR = Principal SENG = Senior Engineer UD1 = User Defined 1 SENV = Senior Environmental Scientist ENG = Engineer UO2 = User Defined 2 ENV Environmental Scientist SDES = Senior Designerrrechnician UD3 = UserDerined3 ADM = Administrative DES = Designerrrechnician *For Project Manager, use one or the technical classifications -For User-Defired Classifications, you will need to edit the Classifications Legendlocaled above. To entera new classification, replace'UDi'Wlth its abbreviation (ex. GRA) and replace "User Defined 1' with the corresponding title (ex. Graphic Artist). Once the user - definitions are added, They will self - populate the Estimate of Hours table, as well as the remaining sheets. EXHIBIT "B" Page 3 of 6 WORK ORDER #1 Labor Rates Project Name: Jackson and Blaine Street Improvement Hours Project Number: URB-64620) Control Number: 22507 CLASSIFICATION Location (City, County): Blair, Washington County %ASSIGNED Firm Name: Felsburg Holt & Ullevig FEL5l3U1ZCi Consultant Project Manager: Matt McFadden $ Phone/Email: 402. 445.44051 mati.mcfadden @fhueng.com 1-I O LT & LPA Responsible Charge: Allen Schoemaker U L L L v I G Phone/Email: (402) 426-4191 / ars @ci.blair.ne.us 51 20000 NDOR Project Coordinator: Jason Freiddetis Environmental Scientist PhonelEmail: (402) 479- 36501ason .freiddchs @nebraska.gov Associate Date: September18,2012 SENG Labor Costs: Hours Code Classitication Title CLASSIFICATION SALARY RATE %ASSIGNED PR Pdnci al 12 $ $611.52 SENV Senior Environmental Scientist 48 TAmount 51 20000 ENV Environmental Scientist 7 Associate 5392.07 SENG Senior En ineer 14 Blended Rate: 5412. SDES ENG En ineer SeniorDesi nerrrechnidan 26 $988.00 DES Desi ner/rechniclan 50.0% Adam Behmer Env. Scientist 11 ADM Administrative Blended Rale:' 525.00 Senior Engineer Associate $56.01 100.0% Matt McFadden 107 3,603.89 TOTALS Blended Rate: "'$55:01- ' Engineer MarkMeisinger Engineer CLASSIFICATIONS% PR = Principal SENG = Senior Engineer UDII = User Defined 1 SENV = Senior Environmental Scientist ENG = Engineer , UD2 = User Defined 2 ENV = Environmental Scientist SDES = Senior Designer/Technician UD3 =User Defined 3 ADM = Administrative DES = Designerrrechnician en e a es or s ee EMPLOYEE NAME CLASSIFICATION SALARY RATE %ASSIGNED Principal Kyle Anderson Principal 11 $67.31 100.0° Blended Rale: $67.31 " " Senior Environmental Scientist Amy Zlotsky Associate 550.96 100.0% Blended Rate: ' S5o.96 Environmental Scientist Allison Sambol Env. Scientist II $27.88 50.0% Adam Behmer Env. Scientist 11 52112 50.0% Blended Rale:' 525.00 Senior Engineer Associate $56.01 100.0% Matt McFadden Blended Rate: "'$55:01- ' Engineer MarkMeisinger Engineer $34.86 10.0% Josh Palik Engineer2 $28.85 90.0% Blended Rale: 529.45 Senior Designerfrechnician Brian Moffatt Sr. Designer S38.00 100.0% Blended Rate: "'588:00`" Deslgner/rechniclan Blended Rate: Administrative Blended Rafe: Input employee classification as aesfgnatea oy firm. z Total of %Assigned" must equal 10095 for each personnel classification category. If one person in classification, list them as 100% for °% Assigned ". EXHIBIT "B° Page 4 of 6 WORK ORDER #1 Direct Expenses Project Name: Jackson and Blaine Street Improvements Project Number: URB-6462(1) Quantity 1 Control Number: 22507 Amount $41.51 Location (City, County): Blair, Washington County " F'ELSBURG Firm Name: Felsburg Holt & Ullevig Consultant Project Manager: Malt McFadden H G L T & - PhonalEmail: 402.445.4405! malt.mcfadden @Ihueng.com U LLE U F G LPA Responsible Charge: Allen Schoemaker ' Phone /Email: ( 402)426.41911ars @ci.blair.ne.us NDDR Project Coordinator: Jason Freldrichs $59.01 PhonelEmail: ( 402) 479 - 3650 /jason.freiddchs @nebraska.gov Date: September 16, 2012 Printing and Rep BM_C Quantity 1 Unit Cost 41.51 Amount $41.51 ColorCopies Subtotal 541.51 TOTAL DIRECT EXPENSES $59.01 Other Miscellaneous Costs: Misc. postage fax etc.. Quantity 1 Unit Cost 41.51 Amount $41.51 Subtotal 541.51 TOTAL DIRECT EXPENSES $59.01 EXHIBIT "Brt Page 5 of 6 WORK ORDER #1 Project Cost Project Name: Jackson and Blaine Street Improvements Project Number: URB•6462(1) Control Number: 22507 Location (City, County): Blair, Washington County "' FELSBURG Firm Name: Felsburg Holt& Ullevig Consultant Project Manager; Matt McFadden H O LT & PhonelEmail: 402.445.44051 malt.mcfadden @fhueng.com U L E. E: v E G LPA Responsible Charge: Allen Schoemaker PhonelEmail: (402) 426-41911 ars @ci.blair.ne.us NOOR Project Coordinator: Jason Freiddchs Phone/Email: (402) 4793650rjason.freldrichs @nebraska.gov rr rt Date: September 18, 2012 • _ Senior Env](onmental Scientist rr rr rt eniorsogin r r D Administrative _ EXHIBIT "Btl Page 6of6