MS-2012-00228_0001.tif i
INTERNATIONAL I TI
CITE OF BLAIR REROOFING
Return to Blair C ity Hail prior to Find Inspection '
216 S 16 th Street, Blair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
i
not interfere with reroofing work, please indicate compliance with the following requirements
following) this reroofing job.
j I
Permit #: n'l S � ► a i
I
Installation Date .Y � ►
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1)
ICE PROTECTION INSTALLED An Ice barrier that consists of at least two layers of j
underlayment or of a self- adhering polymer modified bitumen sheet was installed and I
extends at least from the eave's edge to a point at least 244 Inches inside the exterior
wall line of the building. (R9Q5.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3 '
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter- flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
SignatureO Pri ry i alter Date
Signatug of P6rmit Ho[ er Date