Loading...
250 S Industrial Park Dr.tif i �I CITY Of I)LAIQ rise i November 16, 2012 CF Industries 250 S Industrial Park Dr Blair, NE 68008 I Dear Sirs, Enclosed is Floodplain Permit 2012 -03 for the 432 SF expansion of the office building. As indicated in the permit, since the expansion project is not a substantial improvement to the facility, the facility does not need to be elevated to one foot above the base flood elevation of 1008. Please note that the approved plans indicate, as required by Section G1001.6 of the 2009 International Building Code, that all mechanical, plumbing and electrical equipment and systems be elevated to or above the design flood elevation. According to the Flood Insurance Rate Map issued on January 6, 2012, the base flood elevation in this area is 1008 MSL. The submitted existing site plan indicates the ground level to be approximately 1006 MSL. Please ensure that all mechanical, plumbing and electrical equipment and systems are elevated to at least 1008 MSL. This requirement will be verified by our Building Inspector during his various inspections. If you have any further questions, please contact me at 402 - 426 -4191. Sincerely, ?w (5 mv�� Phil Green Floodplain Administrator Assistant City Administrator PPP4UYUMI 218 South 16th Street • Blalr, Nebraska 68008 m 402 - 426 -4191 . Fax 402 - 426 -4195 ^ E -mail cityofb1a1r @c1,b1a1r.ne.us Permit # / - 0 Issued CITY OF BLAIR FLOODPLAIN DEVELOPMENT PERMIT APPLICATION i Applicant: Uri Phone: q0 a Mailing Address: t0 ►� Ale Authorized Agent: �°� Phone: b � Mailing Address: 918 AJ Ad dr ha 'i r 6- Relationship of Applicant to Property: 0 (owner, tenant, lessee, other) i Address of Proposed Activity: a tCd Legal Description of Proposed Activity: L oL&T 5 7 r� y L DESCRIPTION OF PROPOSED ACTIVITY Building: Non - building: New: _Subdivision of land with grading _ Addition/Alteration _Fill _Routine maintenance _Grading _Residential _Material removal (excavation) Non- residential _Drainage improvement _Moving of structure _Road, street or bridge work _Removal \demolition of structure _Watercourse alteration _Substantial improvement _Other (explain below) _Other (explain below) Other Explanation: i Estimated cost of activity: $' Comments or further explanation of work: C ATTACH A SITE PLAN, DRAWN TO SCALE, SHOWING, AMONG OTHER ITEMS, THE PROPERTY LINES, EXISTING AND PROPOSED BUILDING LOCATIONS, EXISTING AND PROPOSED UTILITIES, ELEVATIONS, FILL, STORAGE AREA, NORTH ARROW AND LOCATION OF WATER AND DRAINAGE FACILITIES. I II. REQUIRED INFORMATION: 1. Site specific data: a. Base flood elevation: Source: b. Mean Sea Level of the existing ground: Source: c. Mean Sea Level of the lowest floor, including basement, of all proposed structures: Source. i d. Mean Sea Level to which any \all proposed structures will be flood proofed: Source: Lg e. Source of Base Flood Elevation data if not available on the FIRM: 2. Proposed activity is located in: ( ) Floodwav — Certification by a registered professional engineer must be provided to the Blair Planning Department, prior to the issuance of this permit, stating the proposed activity will result in no increase in the base flood (100 year) elevation [a no -rise certificate]. ( 100 Year Floodplain (Outside Designated Floodwav) i ( ) Numbered Zone A The source of this information is from the FEMA F o Insurance Rate Map panel number Q [ - ?I (p Dated I d or FLOODWAY map panel number ; Dated If the proposed activity is residential in nature, and is located in the 100 Year Flood plain, the first floor, including basement, of any new or substantially improved residential building (including a manufactured home) shall be elevated a minimum of one (1) foot above the base flood elevation. Residential structures cannot be flood proofed. If the proposed activity is non - residential in nature, and is located in the 100 Year Floodplain, the first floor, including basement, of any new or substantially improved non - residential structure may be either elevated one (1) foot above the base flood elevation or flood proofed to one (1) foot above the base flood elevation. If flood proofing is utilized, a registered professional engineer shall provide certification to the Planning Department, prior to the issuance of this permit, that the flood proofing requirements are met. i III. OTHER PERMITS SUBMITTED TO: (Section to be filled out by applicant. Other permits do not need to be attached.) Corps of Engineers 404 Permit (wetlands) Yes ( ) No State Natural Resources Commission Yes ( ) No OI Papio- Missouri River NRD Yes ( ) No Soil Conservation Service \ ASCS Yes ( ) No (xI I IV. PROPERTY OWNER \SURVEYOR\REGISTERED PROFESSIONAL ENGINEER\ARCHITECT STATEMENT: I hereby certify that the above info tion provided is correct and the proposed activity \ development will meet the applicable requirements of the City of Blai rdinances and federal floodplain management practices. Signature of owner \agent: Date: Signature of Registered Professional Engineer: Date: Signature of Surveyor: Date: V. TO BE COMPLETED BY FLOODPLAIN ADMINISTRATOR: PERMIT IS APPROVED. I have reviewed the plans and materials submitted in support of the proposed development and find them in compliance with the requirements of the City of Blair ordinances and federal floodplain management practices. APPROVED UNCONDITIONALLY AS PRESENTED (Non - buildings only) l APPROVED CONDITIONALLY UPON RECEIVING ELEVATION CERTIFICATIONS _ PERMIT IS DENIED. The proposed development is not in conformance with the requirements of the City of Blair ordinances and federal floodplain management practices (explanation below). tl 1-. Floodplain Administrator Date VI. FEMA ELEVATION CERTIFICATION: (Attach completed FEMA Elevation Certificate Form 81 -31 signed and sealed by a land surveyor, engineer or architect authorized by law to certify elevation information.) Elevation of as -built lowest floor (including basement) of the building: feet Datum BFE depth of flooding at the building site: feet Datum Flood Plain Administrator Date