Loading...
MS-2012-00468_0005.tif i INTERNATIONAL I I CITY OF BLAIR FIN CHECKOFF SHEET Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, NE 68008 Because of limitations caused by the in rm detailed inspections which would not interfere with reroofing work, pie indicate com ith the following requirements following this reroofing job. Permit #: Installation Date: YES NO ❑ The materials a methods of applicati d for re c eying or replacing the existing roof covering c ly with the requirement ding code. (R907.1) ❑ ICE PROTECT STALLED; An ice barrier consists of at least two layers of underlayment of - adhering polymer modified bitumen sheet was installed and extends at le from ve's ed e a point at least 24 inches inside the exterior wall line of building. 2.7.1 I ❑ ® STRUCTURAL COMPONE SOUND: The structural roof components are orting the roof ng system and the material and equipment loads t will be tered during i Ilation of the roof covering system. (R907.2) ❑ ❑ E ING COVE WAS R VED: Existing roof covering was removed for one of t easons requi by sectio 907.3 NO R D METAL FLASHING: Existing vent flashing, metal edges, drain outlets, c s or meta unter - flashing were not reinstalled if rusted. (R907.5) ❑ ASHING IN ED PROPERLY: Flashing shall be reconstructed in accordance approved manufacturer's installation instructions. Metal flashing to which inous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Prim staller Date Signature of Permit Holder Date