Loading...
MS-2012-00468_0001.tif CITY OF BLAIR I � 218 S. 16TH STREET ` BLAIR, NEBRASKA 68008 I �V Building Permit Application (402)426- 4191 -Phone (402) 426 -4195 - FAX MS-2012-00468 ° MIse of �� www.blairnebraska.org 10/1712012 kbedmins MISC Residential October 17, 2012 �g LOCATIONORMPROVEMENT: 2403 Washington St, Blair, NE 68008 „ ARCHITECT: GENERAL SELF OWNER: Paula Schroder CONTRACTOR: 2403 Washington St Blair, NE 68008 BLAIR, NE 68008 -0000 to 21 r G.,�."„”, X..,''x y i }'v siit (t )1 ✓ .aYx .:o......,::,.. .v...._.*.. .: ...o-. ,. .,, rim .., ..;..,... ., rw .... ..-.. ,, ^. .. .. ..,.. .. .> .... ,., .. .. .. i' L ',i i ` ✓ NATURE OF WORK PROPOSED USE Roofing /Soffit/Eaves /Gutters Primary Residence PROJECT NAME PERMIT EXPIRES 10/17/2014 2403WashingtonSt- 121017- Roofing ESTIMATED COMPLETION DATE 12/17/2012 i DESCRIPTION OF WORK j Tear off and replace membrane roof i I DEPOSIT PAID BY: SITE PLAN SUBMITTED: NA Contractor REScheck /COMcheck SUBMITTED: NA DEPOSIT STATUS: BUILDING PLANS SUBMITTED: NA $50 y [ p ,y 1. No work will be started before a permit is ISSUED AND POSTED. 2. For commercial permits, a set of plans for this project must be submitted to the Nebraska State Fire Marshal's Office for review. 3. Separate permits are required for electrical, plumbing, heating, ventilating and air conditioning, and septic system. 4. The undersigned owner or agent understands and acknowledges this building permit application does not constitute issuance of this building permit. It is further understood that construction covered by this permit application shall not be commenced until a copy of a permit signed by the Building Inspector is issued. 5. The undersigned owner or agent agrees to perform the proposed work in accordance with the specifications set forth above and in accordance with the codes /ordinances of the City of Blair and the State of Nebraska. Any omission of or misrepresentation of fact with or without the intention of the undersigned or any alteration or change from this application without approval of the Building Official, shall constitute sufficient ground for the revocation of any permit issued which was based on the approval of this application. LZ Date gnature of Applica