2009 INTERNATIONAL RESIDENTIAL CODE
i
CITY OF BLAIR REROOFING CHECKOFF SHEET { 1 �
Return to Blair City Hall prior to Final Inspection
218 S 16 Street, Blair, HE 68008
i
Because of limitations caused by the infeasibility to perform detailed inspections which would !
not Interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing Job. f
i
Permit #°
i
s
Installation Date;
I
YES NO
® The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (R907.1) i
I
® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j
underlayment or of a self - adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
I
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
° I
® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section R907.3 j
' I
I
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain j
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
I T
with approved manufacturer's installation instructions. Metal flashing to which
bituminous materials a to be adhered shall be primed prior to installation. (R907.6)
na a of Primary Installer Date