Loading...
MS-2012-00311_0003.tif From:MCKINNIS ROOFING & SHEET METAL 402 426 2344 10/16/2012 10:54 #528 P.003/003 2009 INTERNATIONAL RESIDENTIAL CODE i CITY OF BLAIR REROOFING CHECKOFF SHEET { 1 � Return to Blair City Hall prior to Final Inspection 218 S 16 Street, Blair, HE 68008 i Because of limitations caused by the infeasibility to perform detailed inspections which would ! not Interfere with reroofing work, please indicate compliance with the following requirements following this reroofing Job. f i Permit #° i s Installation Date; I YES NO ® The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i I ® ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of j underlayment or of a self - adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) I STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) ° I ® EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 j ' I I NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain j outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance I T with approved manufacturer's installation instructions. Metal flashing to which bituminous materials a to be adhered shall be primed prior to installation. (R907.6) na a of Primary Installer Date Signature of Permit H der Date I