Loading...
MS-2012-00309_0003.tif j From:MCKINNIS ROOFING & SHEET METAL 402 426 2344 10/16/2012 10:53 #528 P.001 /003 2009 INTERNATIONAL RESIDENTIAL CODE I CITY OF BLAIR REROOFING CHECKOFF SHEET Return to Blair City Mall prior to Final Inspection 218 S 16 Street, Blair, NB 68008 Because of limitations caused by the Infeasibility to perform detailed inspections which would i not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. i Permit I Installation bate: I YES NO ā‘ The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (R907.1) i ā‘ ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of aself- adhering polymer modified bitumen sheet was installed and extends at least from the eaves edge to a point at least 24 inches inside the exterior wall line of the building. (8905.2.7.1) I i STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system, (R907.2) i ā‘ EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one of the reasons required by section R907.3 I Iā‘ NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance E with approved manufacturer's installation instructions. Metal flashing to which bituminous materials to be adhered shall be primed prior to installation. (R907.6) I Sig firdwfr Primary Installer Date S nature of lsi it Holder Date