Loading...
MS_2012_00385_0001.tif i ;377 5 � INTERNAT CITY OF BLAIR REROOFING CHECKOFF SHEET - Return to Blair City Hall prier to Final inspection 218 S 16 Street, lair, NE 68008 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements fallowing . this reroofing job, i V f a /vo i 000 ` Permit ! o 0x39-5 11V�T.�L O/e Installation Date: YE3 NO � The materials and methods of application used for recovering or replacing the existing roof covering comply with.the requirements of the building code. (11907.7) ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wail line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SQUND: The structural roof components are capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (8907.2) O r rl EXISTING COVERING -WAS REMOVED: Existing roof covering was removed for one of the reasons required by section 8907.3 NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) . 1 I FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance i with approved manufacturer's installation instructions_ Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Signature of Primary Installer gate Signature of Permit Holder Date 2 / 6'd -�L0 [,69ZZOt 6u1J00JNsuean4 d6O :Zo Z6 Z6 ;oo I