CITY OF BLAIR REROOFING CHECKOFF SHEET -
Return to Blair City Hall prier to Final inspection
218 S 16 Street, lair, NE 68008
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
fallowing . this reroofing job, i
V f a /vo i 000 `
Permit ! o 0x39-5
11V�T.�L
O/e
Installation Date:
YE3 NO �
The materials and methods of application used for recovering or replacing the existing
roof covering comply with.the requirements of the building code. (11907.7)
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wail line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SQUND: The structural roof components are
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (8907.2)
O r rl EXISTING COVERING -WAS REMOVED: Existing roof covering was removed for one
of the reasons required by section 8907.3
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
. 1 I
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
i with approved manufacturer's installation instructions_ Metal flashing to which
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Signature of Primary Installer gate
Signature of Permit Holder Date
2 /