MS-2012-00360_0001 (2).tif i
2UUU INTERNATIONAL RESIDENTIAL CODE
i
CITY OF BLAIR REROOFING CHECKOFF SHEET
Return to lair to y Mall prior to Final Inspection
1 1 Street, Blair, NE 6800
Because of limitations caused by the infeasibility to perform detailed inspections which would
not interfere with reroofing work, please indicate compliance with the following requirements
following this reroofing job.
i
Permit #:
-i
I
Installation Date: f
I
YES NO
The materials and methods of application used for recovering or replacing the existing
roof covering comply with the requirements of the building code. (8907.1)
I
ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of
underlayment or of a self- adhering polymer modified bitumen sheet was installed and
extends at least from the eave's edge to a point at least 24 inches inside the exterior
wall line of the building. (R905.2.7.1)
STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are j
capable of supporting the roof covering system and the material and equipment loads
that will be encountered during installation of the roof covering system. (R907.2)
EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one
i
of the reasons required by section 8907.3 f
I
NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain
f outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5)
FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance
with approved manufacturer's installation instructions. Metal flashing to which I
bituminous materials are to be adhered shall be primed prior to installation. (R907.6)
Sim a e of Primary Installer/ z bate
_:�, t
i
�Sihp t9je of Permit Holder to 1
I