Loading...
MS-2012-00360_0001 (2).tif i 2UUU INTERNATIONAL RESIDENTIAL CODE i CITY OF BLAIR REROOFING CHECKOFF SHEET Return to lair to y Mall prior to Final Inspection 1 1 Street, Blair, NE 6800 Because of limitations caused by the infeasibility to perform detailed inspections which would not interfere with reroofing work, please indicate compliance with the following requirements following this reroofing job. i Permit #: -i I Installation Date: f I YES NO The materials and methods of application used for recovering or replacing the existing roof covering comply with the requirements of the building code. (8907.1) I ICE PROTECTION INSTALLED An ice barrier that consists of at least two layers of underlayment or of a self- adhering polymer modified bitumen sheet was installed and extends at least from the eave's edge to a point at least 24 inches inside the exterior wall line of the building. (R905.2.7.1) STRUCTURAL COMPONENTS ARE SOUND: The structural roof components are j capable of supporting the roof covering system and the material and equipment loads that will be encountered during installation of the roof covering system. (R907.2) EXISTING COVERING WAS REMOVED: Existing roof covering was removed for one i of the reasons required by section 8907.3 f I NO RUSTED METAL OR FLASHING: Existing vent flashing, metal edges, drain f outlets, collars or metal counter - flashing were not reinstalled if rusted. (R907.5) FLASHING INSTALLED PROPERLY: Flashing shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which I bituminous materials are to be adhered shall be primed prior to installation. (R907.6) Sim a e of Primary Installer/ z bate _:�, t i �Sihp t9je of Permit Holder to 1 I