Loading...
Trunk Sewer RepairAMENDMENT NO.1 TO AGREEMENT FOR ENGINEERING SERVICES TASK ORDER NO. 6: TRUNK SEWER REPAIR WHEREAS: HDR ENGINEERING., INC. ( "HDR ") entered into an Agreement on December 13, 2010 to perform engineering services for City of Blair, Nebraska (" OWNER "); OWNER desires to amend this Agreement in order for HDR to perform services beyond those previously contemplated; HDR is willing to amend the agreement and perform the additional engineering services. NOW, THEREFORE, HDR and OWNER do hereby agree: The Agreement and the terms and conditions therein shall remain unchanged other than those sections and exhibits listed below; PART 1.0: Replace the Project Description with the following: "Develop plans and specifications for the construction of a new 24 -inch diameter trunk sewer. The project will include: 1. A 36 -inch diameter steel encasement under the UPRR tracks and US Highway 30 2. z A 24 -inch diameter trunk sewer 3. Connections to the existing sewer completed by offset manholes 4. Open cut of Fairview Drive 5. A new manhole at the project midpoint 6. Abandonment of the existing sewer south of the UPRR 7. Filling of the existing sewer within UPRR right of way PART 4.0: Amend the Periods of Service as .follows: 1. Notice to Proceed: May 9, 20.12 2. 90% plans to City: May 22, 2012 3. Permit Applications: May 25, 2012 4. Final Plans to City: June 6, 2012 PART 5.0: Amend the payment to the ENGINEER by $9,500 to a total not to exceed amount of $19,500. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the day and year written below: HDR ENGINEERING, INC. ( "HDR") By: ��—: -- &2� Its: 1) VLe— 'V re � V'k�e 46� Date: � 1 -7 1 ( - L